My WebLink
|
Help
|
About
|
Sign Out
Home
06/07/88
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
06/07/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:07:58 AM
Creation date
7/26/2006 12:15:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
06/07/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />recommended by the Planning and Zoning Commission on March 19. 1987.' <br /> <br />Motion carried. Voting Yes: Chairman Zimmerman. Commissioners Peterson. <br />Deemer. LaDue. Hendriksen. Shumway and Howell. Voting No: None. <br /> <br />Case ~2: ReQuest For Variancp From Maximum Heivht Allowance For <br />Accessory Structu~e' C~se Of Mr. Jeff Erikson: <br /> <br />T <br /> <br />Ms. Norris stated that Mr. Erikson's building permit application indicated <br />that the structure would be a standard garage with a full basement; there <br />was no indication that it would exceed height restrictions. During <br />construction. Mr. Erikson's contractor informed him that for not much <br />difference in cost he could change the roof pitch to allow usable space <br />above the garage. Mr. Erikson proceeded with that change to construction. <br />the Building Inspector noticed the height violation Bnd imposed a stop work <br />order. <br /> <br />Mr. Erikson stated that he did not intentionally violate height <br />restrictions and noted that his property is zoned B-1 and he would be <br />allowed to build a 35' high office building. <br /> <br />Commissioner Deemer noted that Mr. Erikson's partially constructed building <br />is within setback for B-1 zones; he would also have to submit a site plan <br />to construct an office building. <br /> <br />Mr. Erikson stated that when he applied for the building permit. he <br />mentioned he would be having a loft area that obviously should have been <br />recognized as exceeding the 16 feet height requirement and was not. <br /> <br />Ms. Norris stated that after further review. staff has also determined that <br />Mr. Erikson's building encroaches the setback. <br /> <br />Discussion ensued whether or not the accessory structure can be considered <br />as being located in front of the principle structure according to <br />ordinances that address corner lots. <br /> <br />Mr. Erikson stated that currently he would use the building for storage but <br />in the future he would like to convert it to an apartment and office space. <br /> <br />Motion by Commissioner Howell and seconded by Commissioner LaDue. for <br />discussion. that due to tbe circumstances involved and errors made by staff <br />and the applicant. Mr. Jeff Erikson's case be referred to the City Attorney <br />and City Council. <br /> <br />Further Discussion: Commissioner Hendriksen stated that if action other <br />than denial is going to take place. tben the issue of a site plan should <br />also be addressed. Chairman Zimmerman noted that one of Mr. Erikson's <br />options would be to go through a site plan for a building in a B-1 zone; a <br />site plan and survey would also prove whether or not the building is within <br />the setback. Mr. Erikson repeated that he told Mr. Wirz that the building <br />would have a loft; Mr. Wirz should have recognized at that time that the <br />building would exceed 16' in height. Mr. Hendriksen noted that it is <br />possible to build a garage with a loft and not exceed 16 feet. <br />Board of Adjustment/Harch 26. 1987 <br /> <br />Page 3 of 4 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.