Laserfiche WebLink
<br />5. D:scriptioo of Reqt.est: <br /> <br />This reqtEst is for a conditional u.J_ penni. t for the proposed Atlas <br />contract incine."'ators to be located within the Atlas Service Center <br />wilding. The iminerators ~uld turn a naxim.m of 38 TPD imustrial <br />w:LStes. In conjunction with this use there ~uld be an 84,000 gallon <br />tank storage unit. The contract imine..""ator portion of the Ser-vice <br />Center building ~uld only be ccmpleted after all r-FCA environmental <br />penni ts have been sect..I!'ed. <br /> <br />6. Present zoning district: <br /> <br />Industrial. <br /> <br />7. Sitp. pl~n: <br /> <br />Please see attached plot plan. <br /> <br />t"\ _. ~ <br />o. ltTalna.ge. p..t..a.'1: <br /> <br />Please see actached plot plan. <br />9. Access to site: <br /> <br />All site traffic will enter and exit the facility frcm Irrlustry Ave. <br />N.W. The proposed contract incinerators will add approxinBtely 6 ~ks <br />a day as well as 20 cars a day over 3 shifts. 'Irere will also be a <br />secondary access for EIIErgency use only fran the Atlas Plant site 00 to <br />&lnfish Lake Blvd. <br /> <br />10. Cartage container locatioo: <br /> <br />All gartage will be stored in 20 cubic yard or larger roll-<:lffs. <br />Nonmlly they will be located in Oltside Equipnent Storage. This area <br />will have an internal fence/screen. <br /> <br />1 1. Descriptioo of constn..1ctioo am proposed materials: <br /> <br />The Atlas Service Center in whien the contract imil'e"a.tors will be <br />located will be a pre-€rlgineered steel wilding or pl"EHaSt concrete. <br />In any case all wildings will mve concrete footings located bel~ <br />frost lire. Ccncrete acors will be poured in all incineratioo areas. <br />All ootside traffic areas will be asP1alted or concreted. The propooed <br />Atlas Service Center will consist of 28,coo sqtare feet. Of this, 4lK:O <br />sq. ft. will be used for the first contract imirera.tor. v.hen the <br />secon:i unit is installed, another 4000 ~. ft. of the wilding will be <br />used . <br /> <br />The tank unit will oonsist of a total of 10 tanks, (6 at 10,000 galloos, <br />4 at 6,000 gallons). All tanks will be of a false bottan type set 00 <br />cooorete foondatioos with a concreted diked area. <br /> <br />.,,( <br />