My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 07/10/1997
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1997
>
Agenda - Parks and Recreation Commission - 07/10/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:53:03 PM
Creation date
8/18/2006 12:43:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
07/10/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. } <br /> <br /> <br />City of Ramsey <br /> <br />" 15153 NOWTHEN BOULEVARD N.W., RAMSEY, MINNESOTA 55303 <br /> <br />PHONE (612) 427-1410 <br />FAX (612) 427-5543 <br />TOD (612) 427-8591 <br /> <br />May 29, 1997 <br /> <br />Mr. Donald Nordvik <br />9940 Regent Avenue N. <br />Brooklyn Park, Mn 55443 <br /> <br />Re: Sketch Plan Review ~ Nordvik Addition <br /> <br />Dear Don: <br /> <br />We are in receipt of your proposed sketch plan for Nordvik Addition. We offer the <br />following comments: <br /> <br />1. General. The proposed plat is a replat of Lot 2, Block 2, HY-I0 Ramsey. The <br />subdivision would split the parcel into two equal lots. <br /> <br />2. Zoning. The property is zoned Industrial. <br /> <br />3. Lot Sizes and Dimensions. The minimum lot size in the Industrial District is 1 <br />acre or 43,560 square feet. The proposed size of each of the lots is 39,067 square <br />feet. Staff is recommending a 4,500 square foot deviation from the minimum lot <br />size on each lot so that the existing commercial structure on the property will be <br />on a separate lot of record from the new commercial structure proposed to be <br />developed on the unused portion of the subject property. <br /> <br />4. Access to Lots. The existing lot and the new lot created would have access from <br />147th Avenue N.W. <br /> <br />5. Drainage and Utility Easements. The standard 10 foot drainage and utility <br />easements will have to be provided around the perimeter of each of the lots. The <br />drainage plan will be reviewed with the site plan submitted for"the construction of <br />the new facility on the lot created. <br /> <br />6. Park Dedication. The plat will be reviewed by the Park Commission on June 12 <br />for park dedication requirements. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.