Laserfiche WebLink
<br />I ~ 11'\ ',1 ( .. <br /> <br />Oak - SaVllllDA Restoration PreparatiOXl. - plaxxting - 50,000 <br /> mamtcumee <br />E~ ofPoblic Utilities <br /> WaJer 5,000 <br /> SaDitary Sc'wer 5,000 <br /> Elec1rical S ,000 <br />Storm Water Pond (SCtVing pm) Size- not ~1ished 20,000 <br />Signage Entl'Y, directional. regul2tion 20,000 <br />Lighting Road and security 50,000 <br />r"nd')l',&ping 50,000 <br />Assessmf.:D1 ofSi~ Trees 3,000 <br />Sabtoial $148,200 <br />Design aDd 'Engi7rH<YiDg 10% of subtotal 74,.800 <br />Total 5823,000 <br /> <br />SECOND PHASE <br /> <br />7 <br /> <br />. <br /> <br />. SCHEDULE COST AND NOTES TOTAL COST <br />Groap Pic::oic <br /> Shelta So:ilding (1) with Restroom (3) @ $40,000 / (1) @$100,OOO $220,000 <br /> Park Road 300 L.i. two J..ane @ $24 li 7,200 <br /> Puking Lot with CDrbs 100 eareapacity@$7oopercar 70,000 <br /> - <br />Park Trails - k-pbalt 5,000 Ii @ $S per U:. 40,000 <br />Fishing Access (1) pier plus path and retaining ~O.OOO <br /> wall <br />Lighting Security and road 10,000 <br />Landscaping 20,000 <br />Site Amenities Benches, grills. tables. waste 20,000 . <br />Oak - Savanna. Restoration Prcparatioa . planting - 50,000 <br /> maintenance <br />Subtotal $467,200 <br />Design and Enginc:aing 100.10 of subtotal 46,700 <br />Total $513,900 <br /> <br />Page 27 <br /> <br />~ <br />