Laserfiche WebLink
<br />. ~ .l; . I .t ( . <br /> <br />I o..;p aDd ~S 110% of SlIbtoal 34,900 <br /> <br />Th~ .. ~~OO <br />*The development of the retreat center may only be tmdertaken when the lease with the Andersons <br />expires or if the AndersoDS leave before the expiration of the lease. <br /> <br />.lfJ.....-m PHASE <br /> <br />') <br />, <br /> <br />SCHEDULE COST AND NOTES TOTAL COST <br />Group Picnic <br /> Shelter Buildings (1) 200 capacity I (2) 50 capacity $200,000 <br /> Resa:oo.n To be designed 60,000 <br /> Park Road 400 l.i two lane @ $2.41.!. 9,600 <br /> Pading l.Dt wiIh Curbs 200 car capacity @ $100 per car 140,000 <br />Site .A.meDities Tables, benches, and grills 12,000 <br />;Park Traits SOO l.i @ S10 per fOO( 5,000 <br />River SlOps (3) sites @ $2,000 per site 6,000 <br />T ;g!11i1}g SecDrily 10,000 <br />Oak. SavauDa ~ta1ion Preparation - planting . 25,000 <br /> mainteDance <br />Sabtotal $467,600 <br />Design and Engineering 100/0 of sobtotal 46,800 <br />Total S514.,300 <br /> <br />~ sixth phase of the park: development involves the conversion of Husby homestead into park use. <br />The Husby's have a life estate. <br /> <br />I Grand Total <br /> <br />$2,696,800 <br /> <br />5. CoIIt1icts <br /> <br />See pages 16-18 for a SllIIlIIla1'Y of issues and recommendations. <br /> <br />6. Public Services <br /> <br />Mississippi West. Regional Park is within the MUSA service area. There is sanitary sewer and water <br />lines in the residential development immediately east of the site. Electrical service is available from <br /> <br />Page 29 <br /> <br />~.. <br />