Laserfiche WebLink
<br />APPENDIX A <br /> <br />ALTERNATIVE A PROJECT COSTS (CUL-DE-SAC) <br /> <br />Pavement Removal <br />Grading <br />Class 5 Base <br />Bituminous Wear Course <br />Topsoil <br />Fertilizer, Seed, and Mulch <br />Traffic Control Signage <br />Total Construction Cost <br />Project Overhead @ 25% <br />Total Project Cost <br /> <br />1075 yd2 @ $3/yd2 <br />Lump Sum <br />225 tons @ $7/ton <br />135 tons @ $35lton <br />420 yd3 @ $1 0/yd3 <br />0.5 acres @ $1500/acre <br />Lump Sum <br /> <br />$ 3,225 <br />5,000 <br />1,575 <br />4,725 <br />4,200 <br />750 <br />300 <br />19,775 <br />4.944 <br />$24.719 <br />