My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 08/22/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:48:49 PM
Creation date
8/18/2006 2:05:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-128 - <br />City of Ramsey <br />15153 Nowthen Blvd NW <br />Ramsey, MN <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction \Contracts \1082 - TC Garage <br />TO CONTRACTOR: <br />Twin City Garage Door Company <br />5601 Boone Ave N. <br />New Hope, MN .55428 <br />The Contract is changed as follows: <br />FCA 92 - Proposal dated May 16th, 2006. Add 2x12 at 10x10 doors as Add $1,300.00 <br />shown in drawing 1. Prepare 8x7 opening with wood as shown in <br />drawing 2. at 20x10 door prepare opening with wood, per drawing 3, <br />and supply 10'-6" door. <br />CHANGE ORDER NUMBER: 1082 -01 <br />DATE: 16- Jun -2006 <br />CONTRACTOR DATE: 23- May -2005 <br />CONTRACTOR FOR: RM -1082: Sectional <br />Overhead Doors <br />TOTAL CHANGES: <br />Add $1,300.00 <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith: including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />BKV Group, inc. <br />Minneapo,, N <br />ARCHIT, <br />By <br />Date <br />Twin City Garage Door Company <br />New Hope, MN <br />CONTRACTOR <br />By I - .i <br />J <br />Date <br />City of Ramsey <br />Ramsey, MN <br />OWNER <br />7- /) - e <br />3D /I - Minneapolis <br />Minneapolis, MN <br />By 0 <br />Date <br />ORIGINAL <br />CONSTRUCTION MANAGER <br />• <br />$13,990.00 <br />$0.00 <br />$13,990.00 <br />$1,300.00 <br />$15,290.00 <br />29- Sep -2006 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.