My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 08/22/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:48:49 PM
Creation date
8/18/2006 2:05:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-130- <br />City of Ramsey <br />15153 Nowthen Blvd NW <br />Ramsey, MN <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction \Contracts11061 - George Cook <br />TO CONTRACTOR: George F. Cook Construction Co <br />2300 Nevada Ave N, Suite 200 <br />Golden Valley, MN 55427 <br />The Contract is changed as follows: <br />FCA 29 - Add wood blocking at area A brick piers. <br />FCA 45 - Add grab bars per deatil 1/101 in rooms F114 and F227 <br />FCA 47 - Additional wood blocking at roof expansion joint on upper roof, <br />wood blocking at roof hatch, temp door at hall 168, wood blocking at <br />clerestory <br />FCA 87 - Level out steel at window openings W26 and W28. <br />TOTAL CHANGES: <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />BKV Group, Inc. <br />Minne -•oli MN <br />ARC i <br />.J/ <br />AIMES <br />George F. Cook Construction Co <br />Golden Valley, MN <br />OWNER <br />Date <br />�OfyTRAC�OR <br />By <br />Date <br />CHANGE ORDER NUMBER: <br />DATE: <br />CONTRACTOR DATE: <br />CONTRACTOR FOR: <br />Add <br />Add <br />Add <br />Add <br />Add <br />ORIGINAL <br />1061 -09 <br />16-Jun -2006 <br />25- May -2005 <br />RM -1061: General Trades <br />City of Ramsey <br />Ramsey, MN <br />$4,916.00 <br />$457.00 — <br />$2, 030.00 <br />$329.00 - <br />$7,732.00 <br />$698,000.00 <br />$17,786.00 <br />$715,786.00 <br />$7,732.00 <br />$723,518.00 <br />31- Aug -2006 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.