Laserfiche WebLink
-192 <br />construction of the bank. Staff is continuing to work with the applicant's engineers to resolve this <br />issue. <br />Architectural renderings have been submitted. Staff has requested additional details regarding the <br />type of windows pd. other building materials to be used. Revisions to the architecture have been <br />requested. Also, the building's proposed positioning on the site comes into conflict with the <br />elements discussed in the Town Center Development Guidelines Manual that encourage a <br />walkable environment. <br />Recommendation: <br />It is the stated intent of the Town Center district to encourage a distinctly different development <br />pattern than typical, suburban development. Therefore, the proposed building and drive -thru <br />positioning are not ideal. The proposed location of the drive -thru on the north side of the <br />building, adjacent to the parkway, will not encourage an active pedestrian environment, as the <br />parkway was envisioned to be. Furthermore, the proposed drive aisle on the west side of the <br />building lacks a consideration for pedestrians on the trail along Armstrong Boulevard and <br />provides complicated traffic movements for cars exiting on the south. <br />However, the TC -2 district is meant to be more auto - oriented than other Town Center areas and <br />because the building is not directly adjacent to Sunwood Drive, the concern for the specific <br />building orientation is not as great. It is staff s opinion that the large setbacks from Armstrong <br />Boulevard and West Ramsey Parkway can be mitigated by an increased effort to cater to the <br />pedestrian through the increase of landscaping, fencing, and berming along Armstrong Boulevard <br />and West Ramsey Parkway. <br />The Planning Commission met on August 3, 2006 and discussed their concern about the northern <br />location of the drive thru and the need for a drive aisle. After a much discussion, the Commission <br />ultimately recommended approval of the site plan as proposed contingent upon the City Staff <br />Review Letter dated July 28, 2006 and the installation of the below stated landscaping <br />considerations: <br />1) The installation of a berm on both the Armstrong and the Parkway boulevards <br />between the parking areas /drive aisles and the sidewalk to reduce the visual impact of <br />the parking lot and drive -thru in these areas; <br />2) The continuation of the proposed fencing along the entire west and north perimeter to <br />frame the sidewalk area; <br />3) The installation of tall shrubs and small trees to provide additional screening; <br />4) Construction of West Ramsey Parkway to Zeolite Street <br />5) Compliance with the City Staff Review Letter dated July 28, 2006. <br />