My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 09/07/2006
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2006
>
Agenda - Planning Commission - 09/07/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:40:19 AM
Creation date
9/1/2006 3:11:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
09/07/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # 4 <br /> <br />REQUEST FOR SITE PLAN REVIEW OF MINNESOTA W ATERJET, INC; <br />CASE OF MINNESOTA WATERJET, INC. <br />By: Tim Gladhill, Management Intern <br /> <br />Background: <br /> <br />Minnesota Waterjet has applied for site plan review for the development of a 20,528 square foot <br />office/warehouse facility in the Sunfish Lake Business Park Third Addition. Minnesota Waterjet <br />manufactures custom design metal products. <br /> <br />The following items are enclosed for yourinformation: <br /> <br />a) Site location map <br />b) Site plan <br />c) Drainage, Utility, and Grading plan <br />d) City Staff review letter dated September 1, 2006 <br /> <br />Notification: <br /> <br />Site Plans do not require a public hearing. <br /> <br />Observations: <br /> <br />The site plan is proposing to construct a 20,528 square foot office/warehouse facility on Lot 2, <br />Block 1 of Sunfish Lake Business Park Third Addition. The subject property is 1.87 acres in size <br />and is zoned E-1 Employment; the proposed building is a permitted use in this district. <br /> <br />The site plan complies with the front yard, rear yard, and side yard setbacks established in the E-1 <br />Employment District. Outlot A exists on the south property line as a proposed future road <br />expansion of 144th Ave. . Lot coverage has been calculated at 25.2%, which is under the 40% <br />maximum lot coverage restriction established in City Code. <br /> <br />The site will derive access from Azurite Street. The off-street parking and maneuvering areas will <br />be surfaced with bituminous paving and finished with concrete curbing. The site plan is <br />proposing sufficient parking stalls. Staff is recommending that the access be changed to future <br />144th Avenue at time when that road is constructed. . <br /> <br />The proposed exposed aggregate and random rib precast panel material on the exterior walls is <br />permitted in the E-1 Employment District. <br /> <br />The grading and drainage plan is generally acceptable with the revisions outlined in the City Staff <br />Review Letter. / <br /> <br />." <br />The landscaping plan is generally acceptable in accordance with the revisions outlined in the City <br />Staff Review Letter. <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.