Laserfiche WebLink
BID SCHEDULE <br />Item <br />"A" Pedestrian Unde • ass ana eltuminous i ram <br />Description <br />L.uns.rucu.. <br />Estimated Quantity <br />Unit Price <br />Contract Price <br />se • o <br />Date <br />Extension <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$3,500.00 <br />$ 3,500.00 <br />1 <br />5 3,500.00 <br />1 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />200 <br />SY <br />$5.00 <br />5 1,000.00 <br />200 <br />$ 1,000.00 <br />3 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />60 <br />LF <br />$3.00 <br />$ 180.00 <br />60 <br />$ 180.00 <br />4 <br />COMMON EXCAVATION, EV <br />3500 <br />CY <br />$4.00 <br />$ 14,000.00 <br />3,500 <br />$ 14,000.00 <br />5 <br />SALVAGE TOPSOIL (EV) <br />200 <br />CY <br />$3.00 <br />$ 600.00 <br />200 <br />$ 600.00 <br />6 <br />SALVAGE AND REINSTALL AGGREGATE SURFACE (LV) <br />30 <br />CY <br />$3.00 <br />$ 90.00 <br />$ - <br />7 <br />AGGREGATE BASE CLASS 5 MODIFIED <br />140 <br />TON <br />$12.00 <br />$ 1,680.00 <br />95 <br />$ 1,140.00 <br />8 <br />TYPE MV3 WEARING COURSE MIXTURE <br />85 <br />TON <br />$130.00 <br />$ 11,050.00 <br />89.86 <br />$ 11,681.80 <br />9 <br />TYPE MV3 NON - WEARING COURSE MIXTURE <br />50 <br />TON <br />$100.00 <br />$ 5,000.00 <br />67.27 <br />$ 6727.00 <br />10 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />15 <br />GAL <br />$10.00 <br />5 150.00 <br />55 <br />$ 550.00 <br />11 <br />ORNAMENTAL METAL RAILING TYPE A <br />24 <br />LF <br />$100.00 <br />$ 2.400.00 <br />24 <br />$ 2,400.00 <br />_ <br />12 <br />ORNAMENTAL METAL RAILING TYPE B <br />120 <br />LF <br />$100.00 <br />$ 12,000.00 <br />120 <br />$ 12,000.00 <br />13 <br />CONCRETE CAST-IN-PLACE HEADWALL <br />2 <br />EACH <br />$56,100.00 <br />$ 112,200.00 <br />2 <br />$ 112,200.00 <br />ARCHITECTURAL TEXTURE TREATMENT <br />• . 995 <br />SF <br />$31.00. <br />$ 30,845.00 <br />995 <br />$ 30,845.00 <br />14 <br />ARCHITECTURAL COLOR SYSTEM <br />995 <br />SF <br />$4.40 <br />$ 4,378.00 <br />995 <br />$ 4,378.00 <br />15 <br />16 <br />14X10 PRECAST CONCRETE BOX CULVERT <br />100 <br />LF - <br />$1,300.85 <br />$ 130,085.00 <br />100 <br />$ 130,085.00 <br />17 <br />18" RC APRON AND GRATE <br />1 <br />EACH <br />$1,400.00 <br />$' 1,400.00 <br />1 <br />$ 1,400.00 <br />18 <br />15" RC PIPE SEWER DESIGN 3006, CL5 <br />21 <br />LF <br />$25.00 <br />$ 525.00 <br />21 <br />$ 525.00 <br />19 <br />18" RC PIPE SEWER DESIGN 3006, CL3 <br />235 <br />LF <br />$28.00 <br />$ 6,580.00 <br />235 <br />$ 6,580.00 <br />20 <br />14" STEEL CASING PIPE (OPEN CUM <br />140 <br />LF <br />$50.00 <br />$ 7,000.00 <br />140 <br />S 7,000.00 <br />21 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 <br />8 <br />LF <br />$200.00 <br />$ 1,600.00 <br />8 <br />$ 1,600.00 <br />22 <br />CASTING ASSEMBLIES A -70 <br />1 <br />EACH <br />$400.00 <br />$ 400.00 <br />1 <br />$ 400.00 <br />23 <br />CASTING ASSEMBLIES M-6 (721) <br />2 <br />EACH <br />$400.00 <br />$ 800.00 <br />2 <br />$ 800.00 <br />24 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN H - 4006 <br />1 <br />EACH <br />$352.00 <br />S 352.00 <br />1 <br />$ - 352.00 <br />RANDOM RIP RAP CLASS 2 <br />10 <br />CY <br />$70.00 <br />$ 700.00 <br />10 <br />$ 700.00 <br />25 <br />26 <br />RANDOM RIP RAP CLASS 3 <br />6 <br />CY <br />$90.00 <br />$ 540.00 <br />6 <br />$ 540.00 <br />SILT FENCE TYPE MACHINE SLICED <br />220 <br />LF <br />$4.00 <br />$ 880.00 <br />$ - <br />27 <br />SEEDING <br />1.3 <br />ACRE <br />$800.00 <br />$ 1,040.00 <br />1 <br />$ 800.00 <br />28 <br />SEED MIXTURE 260 <br />130 <br />LB <br />$2.00 <br />$ 260.00 <br />100 <br />$ 200.00 <br />29 <br />MATERIAL TYPE 3 <br />2.6 <br />TON <br />$400.00 <br />$ 1,040.00 <br />2 <br />$ 800.00 <br />30 <br />MULCH <br />FERTILIZER ANALYSIS 24 -2 -24 <br />520 . <br />LBS <br />$0.70 <br />$ 364.00 <br />400 <br />$ 280.00 <br />31 <br />COMMERCIAL <br />-- r . . ICI lag All <br />August 9, 2006 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303 -6197 <br />RE: TH No. 47 Pedestrian Underpass and Bituminous Trail Construction <br />Contractor. Landwehr Construction, Inc. <br />Contract Amount $362,497.42' <br />Award Date: July 27, 2005 <br />Completion Date: October 15, 2005 <br />Total Bid Schedule "A" - PEDESTRIAN UNDERPASS <br />• Chan91e Order No. 1 <br />1 Impact Attenuators <br />Total Change Order No. 1 <br />' Revised per Change Order No. 1 <br />ra3177PEPay Estimate i5 Mel <br />33 <br />PAY ESTIMATE #5, FINAL <br />CITY OF RAMSEY, <br />TH No. 47 Pedestrian Underpass <br />And Bituminous Trail Construction <br />Improvement Project No. 05 -29 <br />Dear Council Members: <br />The following work has been completed on the above - referenced project by Landwehr Construction, Inc. <br />EACH <br />PE - 1of2 <br />$298.74 <br />$ 9,858.42 <br />$ 9,858.42 <br />33 <br />Owner <br />$ 9,858.42 , <br />9,858.42 <br />-147- <br />