My WebLink
|
Help
|
About
|
Sign Out
Home
1994 Working Papers
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1993 (Incompleted)
>
1994 Working Papers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 8:26:57 AM
Creation date
9/14/2006 8:22:00 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'i ~. ,t <br /> <br /> <br />DATE: <br />TO: <br />FROM: <br />RE: <br /> <br />City of Ramsey <br /> <br />PHONE (612) 427-1410 <br />FAX (612) 427-5543 <br />TTD (612) 427-8591 <br /> <br />15153 NOWTHEN BOULEVARD N.W., RAMSEY, MINNESOTA 55303 <br /> <br />MEMORANDUM <br /> <br />December 9, 1994 <br /> <br />Planning Commission <br /> <br />Sylvia Frolik:, Zoning Administrator <br />Transportation/Land Use Plan <br /> <br />Enclosed for your review prior to the Comprehensive Plan Subcommittee meeting at 7 :00 p.m. on <br />Thursday, December 15 is a color version of Staffs understanding of the Planning Commission's <br />recommendation for land use and transportation. Apparently, these color maps were ready <br />prepared prior to the December Planning Commission meeting, but were not passed on to me for <br />disuibution at your meeting. <br /> <br />You did say that you wanted to produce a color map of your recommendations utilizing the same <br />color legend as the EDC version. The only difference between the EDC version and this Planning <br />Commission version is that the EDC map uses one color for all commercial, industrial and <br />business warehouse uses; the Planning Commission map uses three colors for these uses. Perhaps <br />this can be remedied without completing redoing the maps. <br /> <br />In addition, Staff is preparing a cost analysis for each of the considered bridge alignments. This <br />information should be available for your review at the December 15 subcommittee meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.