My WebLink
|
Help
|
About
|
Sign Out
Home
1994 Working Papers
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1993 (Incompleted)
>
1994 Working Papers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 8:26:57 AM
Creation date
9/14/2006 8:22:00 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, .. <br /> <br />'{ <br /> <br />Memorandum <br />May 19, 1994 <br />Page 2 <br /> <br />3. Planning for park [and trail] development, land acquisition and programs <br />should be coordinated with adjacent communities, the school district, the <br />County, the State, the Department of Natural Resources, and other <br />governmental bodies. <br /> <br />4. Parks and open space [and trails] should be developed and improved to take <br />maximum advantage of natural features such as Lake !tasca, Sunfish Lake, <br />Trott Brook, natural drainage areas, wooded areas, or other significant <br />physical features. <br /> <br />5. Great effort should be made to preserve land along Trott Brook to link a major <br />trail system across the City which could eventually tie in with the Rum River <br />and Central Park in the northeast corner of the City. Consideration should be <br />given to implementing this through selected acquisitions, trail easements, and <br />scenic easements as well as park dedications. <br /> <br />14. To a practical extent, the Planning and Zoning Commission should adhere to <br />the policies of land acquisition, parks and open spaces and trailways <br />(greenbelts, waterways, bike trails, hiking trails, ski trails, snowmobile trails, <br />walkways, etc.) as recommended by the Park and Recreation Commission. <br /> <br />18. As called for by the Mississippi River Critical Area Designation, a continuous <br />trail will be provided along the Mississippi River for pedestrian and bicycle <br />use. Where direct access is not possible, existing streets will be used as part <br />of the trail system and identified with signs. The proposed trail is identified <br />in Ordinance 89-11. <br /> <br />20. A component of the City's trail system should be to provide neighborhood <br />access to developed parks while minimizing the number of major road crossings <br />and providing a trail system separate from roadways. <br /> <br />22. In an effort to stretch park development funds, the city should aggressively <br />pursue park [and trail] development grant funds as available and other <br />alternative funding sources (e.g. tax increment financing and CDBG funds). <br /> <br />On review, the goals are complete and sufficient for the City's recreational trail <br />system, but inadequate in the area of commuter trails. The commuter trail system <br />should be designed to link residential areas with places of employment, shopping, <br />educational and social/community services, and transit facilities and services. The <br />commuter trail system could also be linked to the City's recreational trail system. <br /> <br />As part of the process for developing the Trail System element of the Comprehensive <br />Plan, the list of goals will be expanded to include commuter trails. Efforts will be <br />made to relate the commuter trail system to transit services and other alternative <br />travel modes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.