Laserfiche WebLink
2025 thru 2034 <br />Capital Improvement Plan <br />Ramsey, MN <br />Project # 25-SEW-002 <br />Project Name Emergency Backup Generator LS #7 <br />Total Project Cost $225,000 Department Sewer Utility <br />Type Improvement Category Sewer Utility Improvement <br />Priority 3-Existing Obligation (Med) Status Active <br />Useful Life 50 years <br />Description <br />Installation of backup generator for Lift Station #7 <br />Justification <br />Lift station #7 currently services Brookside Elementary School as well as 300 homes in the Brookfield development. This station averages 30,000 gallons of sewage per day. During a large scale power outage, it if difficult to keep <br />up with the flow coming in. Keeping sewage from backing up into residents basements is extremely difficult. Adding a generator will allow us to focus on the other stations needing attention. <br />Expenditures <br />2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Improvements Other than Building Cost <br />O 0 0 225,000 0 0 0 0 0 <br />Total <br />O 225,000 <br />O 0 0 225,000 0 0 0 0 0 <br />O 225,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Sewer Utility Fund <br />O 0 <br />0 225,000 <br />0 <br />O 0 0 0 <br />0 225,000 <br />Total <br />O 0 <br />0 225,000 <br />0 <br />O 0 0 0 <br />0 225,000 <br />Produced Using Plan -It CIP Software 205 <br />