Laserfiche WebLink
2025 thru 2034 <br />Capital Improvement Plan <br />Ramsey, MN <br />Project # 16-STR-003 <br />Project Name HWY 10 & BNSF RR Grade Separation at Sunfish Lk BI <br />Total Project Cost $2,000,000 Department Street Improvements <br />Type Improvement Category Street Improvement <br />Priority 2-New Addition (High) Status Active <br />Useful Life 60 years <br />Description <br />Construct grade -separated crossings of Highway 10 and BNSF Railway at Sunfish Lake Boulevard. Includes half of the required frontage road improvements. Total) cost of project $72,000,000. City share = $2,000,000 <br />Justification <br />The existing at -grade vehicle and pedestian crossings of the BNSF railroad tracks are unsafe and result in traffic congestion and mobility issues along US Highway 10 and Sunfish Lake Boulevard. When responding to calls for <br />service, emergency vehicles are not able to cross the railroad tracks or US Highway 10 when trains are present. This can result in delays of several minutes or more, depending on the length of train(s). Numerous private access to <br />Highway 10 will be removed improving safety, congestion and mobility on Highway 10. <br />Prior Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />1,250,000 Improvements Other than Building Cost 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Total 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Funding <br />Prior Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />1,250,000 MSA 375,000 0 0 0 0 0 0 0 0 0 375,000 <br />Public Improvement Revolving Fund <br />375,000 0 0 0 0 0 0 0 0 0 375,000 <br />Total 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Produced Using Plan -It CIP Software 209 <br />