Laserfiche WebLink
2025 thru 2034 <br />Capital Improvement Plan <br />Ramsey, MN <br />Project # <br />Project Name <br />24-WTR-002 <br />We11#1 Pressure Filter and Generator <br />Total Project Cost $1,500,000 Department Water Utility <br />Type Improvement Category Water Utility Improvement <br />Priority 4-New Addition (Med) Status Active <br />Useful Life 50 years <br />Description <br />Install pressure filter to remove Iran and Manganese from municipal water supply at well pumphouse #1 and install emergency power supply generator to power the well and filter during power outages. <br />Justification <br />We11#1 will not be connected to the new water treatment plant (WTP) since the price of running a raw watermain line from well #1 to the WTP would be cost prohibitive. However, a small pressure filter would fit within the existing <br />pumphouse and would be able to remove Iran and Manganese from water supplied by well #1, which would add 1.08 million gallons per day to the city's water supply system. Adding an onsite emergency generator will power the <br />well and pressure filter during power outages. Only two city wells currently have emergency power generators. <br />Expenditures <br />2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Improvements Other than Building Cost <br />O 0 1,500,000 0 0 0 0 0 0 0 1,500,000 <br />Total <br />O 0 1,500,000 0 0 0 0 0 0 0 1,500,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Water Utility Fund 0 0 1,500,000 0 0 0 0 0 0 0 1,500,000 <br />Total 0 0 1,500,000 0 0 0 0 0 - 0 0 1,500,000 <br />Produced Using Plan -It CIP Software 292 <br />