Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br /> <br />TRANSIT <br /> <br />Transportation alternatives other than private automobiles are limited in the City. The City is <br />not served by regional transit systems nor is it likely to be in the near future. <br /> <br />Anoka County has initiated the Anoka County Traveler service which offers access to the regional <br />system through the use of minibuses. The buses are handicap accessible and provide services <br />throughout the County. The start-up program provides service to Ramsey on Mondays, <br />Wednesdays, and Fridays from 7:00 a.m. to 7:00 p.m. and from 10:00 a.m. to 6:00 p.m. on <br />Saturdays. Since the program has only recently begun, no meaningful ridership data is yet <br />available. <br /> <br />The City should encourage the use of this service for residents as a cost effective alternative to <br />complement transportation service demands. <br /> <br />LIGHT RAIL TRANSIT <br /> <br />The County's 2010 Transit System Concept Plan indicates that light rail transit (LRT) could be <br />extended to Ramsey. This, however, is likely to be beyond the year 2010 planning period and <br />would parallel the Highway #10 Corridor. The City will continue to work with the County as <br />LRT plans are further developed. <br /> <br />V. TRAFFIC ANALYSIS ZONES/LAND USE ANALYSIS <br /> <br />The City is currently divided into ten traffic analysis zones (TAZ) (Figure 12). This is an <br />increase from the last MUSA expansion at which time the City was divided into three traffic <br />analysis zones. Future land use was analyzed by traffic analysis zone to determine potential <br />impacts on the Metropolitan Highway System. Table 8 indicates a total of approximately <br />1,366,689 square feet of possible business/commercial and industrial building development. <br />Approximately 72 percent of this possible development is located in TAZs 44, 45, 46, and 47. <br /> <br />Table 8 translates the developable acreage into potential building square footage assuming a 15 <br />percent maximum lot coverage for industrial lands and rural business and 30 percent lot <br />coverage for commercial businesses in the urban service area. Table 9 indicates the potential <br />number of employees based on Metropolitan Council conversion factors for different commercial <br />and industrial uses. Under these assumptions, the potential exists at this development level for <br />approximately 2,870 employees in the City. The majority of these will be employed in T AZs <br />44, 45, 46, and 47. Table 10 shows the employment projections for the retail segment of the <br />currently available commercially zoned property. <br /> <br />The total number of commercial/industrial trips generated per day at this level of development <br />could approach 40,000 movements. This underscores the need for continued development of <br />frontage roads along T.H. #10, controlling access to T.H. #10, and providing efficient internal <br />circulation in the business and commercial areas of the City. Additional east/west collectors <br />have been budgeted for in the City's year 2000 Capital Improvements Program. <br /> <br />22 <br />