Laserfiche WebLink
SECTION 3.0 SIDEWALK AND TRAIL REPLACEMENT AND REPAIR POLICY <br />3.01 Upon completion of the initial sidewalk and trail survey, the Director of Public Works or designee <br />shall establish a replacement and repair schedule. This schedule is subject to modification based <br />both on sidewalk and trail conditions and the availability of resources for sidewalk and trail <br />replacement and repair. The sidewalk and trail replacement and repair schedule will: <br />a. Prioritize replacement of sidewalks and trails in a reasonably timely manner considering available <br />funding. <br />b. Take into consideration and weigh the following factors: <br />1. Sidewalk and trail location and amount of pedestrian traffic. <br />2. Proximity sidewalk/trail identified as needing replacement or repair to other <br />sidewalks/trails also needing replacement or repair. <br />c. The nature and severity of the condition needing replacement or repair. <br />d. The City's budget for replacement or repair of sidewalks and trails <br />e. Whether, or to what extent, the cost of repair can be recovered from adjacent property <br />owners. <br />f. Availability of employees, equipment, independent contractors and other resources <br />needed for replacement or repair. <br />g. Public safety impacts. <br />h. History of prior accidents or complaints. <br />31Page <br />