Laserfiche WebLink
<br />.. <br /> <br />Addition to Case #4 <br /> <br />Comprehensive Plan Update <br />By: Ryan R. Schroeder, City Administrator <br /> <br />Background: <br /> <br />Through the agenda materials, Council was informed that staff would be providing an update at <br />your meeting. Council was also informed that the Council committee of Zimmerman and Steffen <br />would be meeting with the consultant on July 2, 1997. This meeting occurred; after which the <br />consultant forwarded an amendment to his earlier proposal to complete the 1998 Comprehensive <br />Plan. This new proposal is attached for your review. <br /> <br />The first proposal from HKGI was in the amount of $63,905 to $65,905, with the range resulting <br />from the intensity of the focus group process. The new proposal is in the amount of $65,795. <br />Both proposals hadlhave the opportunity to purchase additional services at an hourly rate. <br /> <br />In preparation for the committee meeting, staff forwarded all of the planning and forecasting <br />documentation available within our offices. As a result ofthe availability of this information, the <br />consultant was able to reduce those portions ofthe workplan by $4,170 (tasks 2.0 and 6.0). <br /> <br />As a result of the committee meeting, the consultant added $15,060 in additional work and <br />deleted another $9,000 to $11,000 in tasks. The original proposal provided for a visioning <br />process (3.0) as well as a telephone survey (3.5). The survey was deleted from the basic service <br />package but is available as an alternate. In exchange, the consultant added $5,840 in special <br />interest and focus group meetings (tasks 3.6, 3.8, and 5.4). Also added was an urban design <br />element (tasks 1.5 and 5.3) which had been listed as an alternate in the earlier proposal. This <br />$6,720 addition is expected to allow for planning of design elements which can connect <br />neighborhoods and can address the issues of differing land uses in close proximity. <br /> <br />Earlier, the consultant had presented that his expectation was that $38,500 would need to be <br />allocated within this budget year with the balance in 1998. This demand upon revenues in 1997 <br />is not expected to change to any great degree within the new proposal. It should be noted that <br />City staff will be expected to provide much of the base mapping as well as all of the meeting <br />arrangements and mailing. It should also be noted that extra meetings required beyond the basic <br />scope of services will be billed at time and materials. It appears that these meetings should be <br />expected to cost up to $670 per meeting. Finally, the consultant did not provide a cost estimate <br />for printing and publication. This, therefore, also becomes a City responsibility beyond the <br />proposal budget. <br /> <br />Council Action: <br /> <br />Motion to authorize the Mayor and City Administrator to enter into a contract for <br />Comprehensive Planning services with the firm of Hoisington-Koegler Group Inc. <br /> <br />Reviewed by: <br /> <br />City Administrator <br /> <br />CC: 07/08/97 <br />/jmt <br />Comp.doc <br />