My WebLink
|
Help
|
About
|
Sign Out
Home
1999 Correspondence
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
2000-2009
>
2001
>
1999 Correspondence
>
1999 Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 1:37:45 PM
Creation date
9/19/2006 12:35:13 PM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />DNo <br />I2J Yes please describe (e.g., park & rides, flexible work hours, mixed land uses). See <br />pages VI-16 through VI-18. <br /> <br />5. Is this proposed land use change located adjacent to a principal arterial or "All minor arterial? <br /> <br />DNo <br />(g1 Yes . . please describe site access to the arterial, and whether location and spacing of <br />the access is consistent with Access Spacing Guidelines: The majority of the land use chane:es are located <br />alOIU! TH 47 and TH 10 with access only at maior intersections trom the secondary roadway system. <br /> <br />6. Does the proposed plan revision or amendment positively or negatively affect pedestrian or bike systems? <br /> <br />DNo <br />IZI Yes. . please describe the effects: Trail planning is an important component of <br />the transportation plan but more for a recreational purpose due to Rasmev's suburban style of planninlZ. See <br />pages VI-19 and Figure VI-4. <br /> <br />\_ \0 ~ <br />9~0 v~ <br /> <br />1. Totalllow for community based on existing plan: ~ ~ ~-G,- <br />year 2000: 0.987 million gallons/day (mgd) . ~ cr~'.. ~- <br />year 2010: million gallons/day (mgd) ~ <br />~~.~~. \ <br />2. Total proposed flow for community, based on plan revision or amendment: cY"~_ <br />year 2000: 1.145 million gallons/day (mgd) <br />year 2010: 1.881 million gallons/day (mgd) <br /> <br />B. Wastewater Treatment <br /> <br /> <br />3. If community discharges to more than one metropolitan interceptor, indicate which interceptor will be <br />affected by the revision or amendment. NA <br /> <br />4. Will flows be diverted from one interceptor service area to another? <br /> <br />IZI No <br />o Yes.. if yes, describe the change and volumes (mgd) involved <br /> <br />5. Is any wastewater flow an inter-community flow to an adjoining community's sanitary sewer system? <br /> <br />~ No <br />o Yes.. if yes, enclose a copy of the inter-community agreement. <br /> <br />3 <br /> <br />0p:~1 bb. LZ )3G <br /> <br />p0d pL~ <br /> <br />~31830~ N018NISIOH <br /> <br />Bf:B9Bf:f:-Z19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.