Laserfiche WebLink
<br />8 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br /> <br />plans for two (2) additional subdivisions which will provide for an additional 229 residential <br />lots by the end of 1993-94. The total number of new lots with City services would be a total of <br />532 lots within the next five (5) years. <br /> <br />It is recognized that the recent demand for residential permits per year may decline. The five <br />(5) year historical average number of new residential building permits issued is 135 permits <br />per year. However, in years with a large number of available lots with City services, the total <br />number of building permits issued is greater. This is further supported by the figures from <br />1987 and 1988 in which it is assumed that housing starts will decline somewhat over the next <br />eight (8) years (due to economic cycles, cost of homes, interest, etc.) to 75% of the five (5) <br />year average, 100 permits a year would be issued. If the City is successful in encouraging <br />development in the urban area rather than rural areas, 75% of the new homes will be developed <br />in the urban area. An estimated 2.5 units per gross acre and 3.5 units per net developable acre, <br />22 acres of MUSA land per year would be absorbed by residential development. Over the eight <br />(8) year time period from 1992 to 2000, 176 acres would be absorbed. The 117 acres of <br />residential land that has been included in the 2000 MUSA would meet the anticipated demand <br />through the year 1997, based on a declining rate of housing starts. By 1997 the City will be <br />reviewing its projections for the next thirteen (13) years to estimate the future need of a <br />major comprehensive plan amendment including an expansion of the MUSA.. <br /> <br />In order to achieve the desired emphasis on development within sewered areas, an adequate <br />supply of residential land must be available within the MUSA. By assuring an adequate supply of <br />land, the City can achieve multiple goals consistent with regional policies. They are: <br /> <br />Provide a variety of housing opportunities within the community in terms of <br />development patterns, land use, and living styles. <br /> <br />Encourage growth within the urban area by providing quality development opportunities. <br />At the same time. development pressures within the rural area may be reduced. <br /> <br />Enhance the City's economy by providing a growth oriented environment which <br />encourages development in an orderly manner. <br /> <br />Capture some of the urban development activity occurring in communities outside of the <br />seven county area due to the leapfrogging caused by restricted development opportunities <br />on the fringe of the Metropolitan Region. <br /> <br />III. RURAL DENSITY <br /> <br />Rural Character <br />Figure 2 illustrates the existing character of Ramsey outside of the Metropolitan Urban Service <br />Area. As shown, the City's non-sewered area has already undergone extensive development. <br />Existing development ranges from minimum lot sizes of one (1 ) acre to larger and undeveloped <br />lots or parcels. Two and one-half acre lots are the predominating size in developments. <br /> <br />Also illustrated on Figure 3 are existing and designated parks and open space. Areas unsuitable <br />for development such as floodplains, wetlands, and poor soils are shown on Figures 4 & 5. Table <br />6 indicates existing developed and undeveloped acreage by service area. <br /> <br />The gross land area in the non-sewered area of the City is 14,412 acres. All but 4,084 acres <br />(28%) are either developed or unsuited for development. Of these 4084 acres, 74 acres are <br />zoned Rural Business (1.8%), 72 acres are zoned Industrial (1.8%) 23 acres are zoned <br />General Business (0.6%) The remaining 3915 acres are zoned Rural Residential (95.9%). <br />