My WebLink
|
Help
|
About
|
Sign Out
Home
Trail Development Volume II
>
Park & Recreation Comm Miscellaneous
>
Trott Brook Corridor
>
Trail Development Volume II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2006 11:37:28 AM
Creation date
9/22/2006 11:36:21 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />12. Physical Impacts on Water R'lOurce. Will the project involve the physical or hydrologic alteration (dredging, filling, stream diversion, <br />outfall structure, diking, impoundment) of any swface water Qake, pond, wetland, stream, drainage ditch)? 0 Yes 0 No <br />If yes, identify the water resource to be affected and describe: the alteration, including the construction process; volumes of <br />dredged or fill material; area affected; length of stream diversion; water surface area affected; timing and extent of fluctuations <br />in water surface elevations; spoils disposal sites; and proposed mitigation measures to minimize impacts. <br /> <br />13. Water U.. <br />a. Will the project involve the installation or abandonment of any wells? 0 Yes 0 No <br />For abandoned wells give the location and Unique well number. For new wells, or other previously unpermitted wells,. give <br />the location and purpose of the well and the Unique well number (if known). <br /> <br />b. Will the project require an appropriation of ground or surface water (including dewatering)? 0 Yes 0 No <br />If yes, indicate the source, quantity, duration, purpose of the appropriation, and DNR water appropriation permit number of <br />any existing appropriation. Discuss the impact of the appropriation on ground water levels. <br /> <br />C. Will the project require connection to a public water supply? 0 Yes 0 No <br />If yes, identify.the supply, the DNR water appropriation pennit number of the supply, and the quantity to be used. <br /> <br />14. Water-related Land U.. Management DI.trtcta Does any part of the project site involve a shore1and zoning district. a delineated lOO-year <br />flood plain, or a state or federally designated wild or scenic river land use district? 0 Yes 0 No <br />If yes, identify the district and discuss the compatibility of the project with the land use restrictions of the district. <br /> <br />15. Water Surface U.. Will the project change the number or type of watercraft on any water body? 0 Yea 0 No <br />If yes, indicate the current and projected watercraft usage and discuss any potential overcrowding or conflicts with other users <br />or fish and wildlife resources. <br /> <br />16. So/I. Approximate depth (in feet) to: <br />Ground water: minimum . average Bedrock: nununum average <br />Describe the soils on the site, giving SCS classifications, if known. (SCS interpretations and soil boring logs need !!Q! be attached.) <br /> <br />.17. Ero.I.n.od SodJmontod.n Give the aaeoge to be graded 0' """,vated and the <ubi< yanU.f ",U to be moved, <br />acres ; cubic yards <br />I Describe any steep slopes or highly erodible soils and identify them on the site map. <br />Describe the erosion and sedimentation measures to be used during and after construction of the project. <br /> <br />I <br /> <br />I <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.