|
•
<br />• 500 73rd Avenue NE, Suite 123 • Minneapolis, MN 55432 • Phone (763) 786.9800 • Facsimile (763) 786.2952 •
<br />C.P. 05-20 Park File No. 06 -08 • Ramsey, MN
<br />TKDA - Park Construction Company - PERIOD THROUGH 09/01/06
<br />1500 Piper Jafray Plaza Bruce R. Carlson, Project Manager - PARKS JOB NUMBER 0608
<br />444 Cedar Street 500 73rd Avenue NE, Suite 123
<br />St. Paul, MN 55101 -2140 - Minneapolis, MN 55432 - -
<br />Telephone: 651- 292 -4400 Telephone 763.717.6211
<br />Facsimile: 651- 292 -0083 Facsimile 763.786.2952
<br />' PAYMENTS
<br />PREVIOUS THIS MONTH
<br />0Z'Z0S'9 $
<br />•
<br />9 9
<br />to
<br />$ 76,519.80
<br />$ 2,929.00
<br />$ 4,870.00
<br />$ 1,134.00 I
<br />$ 910.50
<br />I $ 566.30
<br />$ 404.80
<br />I $ 2,770.20
<br />$ 1,120.05
<br />1 00 $
<br />55'190'5 $
<br />9L'99£'9E $
<br />6L69 $
<br />$ 147.90
<br />$ 465.00
<br />1 09'LLl $
<br />09'665'£ $
<br />09•191 $
<br />O9'OL $
<br />S 1,428.80
<br />$ 80,400.20
<br />$ 20,256.55
<br />$ 48,648.50
<br />04'994'9 $ II
<br />OL'E9t'86 $
<br />$ 535,840.08
<br />$ 5,146.00
<br />■
<br />I $ 6,576.00
<br />li $ 610.00
<br />00'969 $ I
<br />00'980'1 $
<br />03' I. $
<br />0t'Z$9'6t $
<br />$ 12,936.00
<br />$ 376.00
<br />$ 8,598.60
<br />$ 13,210.40
<br />1,350.00
<br />$ 1,130.00
<br />00'OSL'0Z $ I
<br />OE'E17S'1Z $
<br />$ 2,800.00
<br />QUANTITIES COMPLETED TO DATE
<br />TOTAL
<br />WORK-IN- MATERIAL- COMPLETED
<br />QUANTITY PLACE . ON -HAND & STORED
<br />$ 85,022.00 I
<br />$ 2,929.00
<br />$ 4,870.00
<br />1 09'016 $
<br />00'1 $
<br />$ 566.30 I
<br />$ 404.80
<br />I 90'00t'l $
<br />0Z'0LL'Z $
<br />006£9 $
<br />99'190'1 $
<br />SL'9SC'S£ $
<br />91'69 $
<br />00'994 $
<br />06'Ltl $
<br />$ 3,592.80
<br />$ 171.60
<br />$ 70.80
<br />$ 151.60
<br />$ 1,428.801
<br />$ 80,400.20
<br />I $ 20,256.55 I
<br />$ 48,648.50
<br />I $ 98,483.70
<br />$ 5,468.40
<br />I $ 535,840.08
<br />$ 5,146.00
<br />I $ 6,576.00
<br />$ 610.00
<br />$ 1,288.00
<br />$ 698.00
<br />I $ 49,632.40 I
<br />$ 38,511.20
<br />� 00'9LE $
<br />00'966'ZL $
<br />0t'Ol Z'£t $
<br />09'969'9 $
<br />I $ 1,350.00
<br />$ 1,130.00
<br />I $ 21,543.30
<br />$ 20,750.00
<br />$ 2,800.00 I
<br />4:13
<br />FA
<br />69
<br />00'050'99 $
<br />00'0L8'17 S
<br />00'606'0 $
<br />$ 1,134.00 I
<br />$ 910.50
<br />$ 566.30
<br />$ 404.80
<br />$ 2,770.20I
<br />$ 1,120.051
<br />$ 1,067.55
<br />$ 639.00
<br />$ 69.75
<br />$ 35,358.75
<br />$ 147.90 I
<br />$ 465.00
<br />09' IL $
<br />09'Z69'E $
<br />09'196 $
<br />08'OL $
<br />$ 1,428.80
<br />$ 80,400.20
<br />$ 20,256.55
<br />$ 48,648.50
<br />$ 98,483.70
<br />$ 5,468.40
<br />$ 535,840.08
<br />$ 5,146.00
<br />I $ - 6,576.00
<br />$ 610.00
<br />$ 1,288.00
<br />$ 698.00
<br />I $ 49,632.40
<br />$ 38,511.20
<br />$ 12,936.00
<br />$ 376.00
<br />Ot'O6E'El $ I
<br />09'969'9 $
<br />00'0E1.'1 $
<br />00•0SE'l $
<br />00•09L'OZ $
<br />0E'E4S'LZ $
<br />I $ 2,800.00
<br />00' L
<br />00'1.
<br />00'60
<br />00'51
<br />OL )
<br />00'95
<br />OL'0
<br />324.00
<br />131.00
<br />647,00
<br />355.00
<br />15.00
<br />20,205.00
<br />I 00£
<br />00'5
<br />00'E
<br />00'666'0
<br />00'Z
<br />00'Z
<br />00'Ot8'ZZ
<br />00'46
<br />2,719.00
<br />6,530.00
<br />00'809'E
<br />00114'9
<br />I 12,473.00
<br />3,100.00
<br />00'1
<br />00'091
<br />00' 1
<br />00'Z
<br />I 1,486.00
<br />1,058.00
<br />308.00
<br />8.00
<br />153.00
<br />196.00
<br />00'1
<br />00'8
<br />00
<br />00'LEZ
<br />00'Z
<br />SCHEDULED CONTRACT BID ITEMS AND VALUES
<br />ITEM DESCRIPTION OTY UNIT UNIT $ AMOUNT I
<br />$ 85,022.00I
<br />$
<br />4,040.00
<br />$ 4,870.00
<br />01091 $
<br />00 . 009' 6 $
<br />06'SL $
<br />00'609 $
<br />$ 2,641.95 1
<br />$ 1,120.05
<br />$ 1,070.85
<br />$ 639.00
<br />$ 79.05 I
<br />$ 35,358.75
<br />$ 147.90
<br />$ 465.00
<br />09'ILl CI
<br />00'000'9 $
<br />09'191 - -- $
<br />09'OL $
<br />00'000'09 $
<br />0913017' l $
<br />$ - 20,256.55 I
<br />$ 48,648.50
<br />04'994'5 $
<br />0(591'96 $
<br />$ 524,670.48
<br />$ 4,888.70
<br />I $ 6,658.20
<br />610.00
<br />$ 1,932.00
<br />$ 698.00
<br />$ 49,632.40
<br />$ 39,639.60
<br />$ L 12,936.001
<br />_- 376.00
<br />0t'01Z'EL $
<br />04'190'9 $
<br />$ 1,350.00
<br />$ 1,130.00
<br />00'0SL'OZ $
<br />0E'£49'12 $
<br />1 00'009'0 $ I
<br />00'000' $
<br />$ 101.00
<br />$ 4,870.00
<br />OL'09 $
<br />00'009'1 $
<br />00'90 S
<br />00'609 $
<br />99 $
<br />55'8 $
<br />9 9' l $
<br />59'1 $
<br />5Lt $'
<br />59'1 $
<br />$ 49.30
<br />$ 155.00
<br />OZ'LS $
<br />00' $
<br />09'SL $,
<br />Ot'SE $
<br />Z9 '£ S
<br />00'91 $
<br />94'1 $
<br />91 $
<br />SS't $
<br />10191 $
<br />99'5 $
<br />96'017 $
<br />00'Ot9 $�
<br />OL lt $
<br />$ 644.00
<br />$ 698.00
<br />Ot $
<br />O $
<br />00'14 $
<br />00'0t $
<br />017'L9 $
<br />00'99 $
<br />$ 450.00
<br />$ 1,130.00
<br />00'991 $
<br />06'06 $
<br />I $ 1,400.00
<br />Si
<br />33141
<br />OV
<br />3301
<br />OV
<br />Al
<br />Al
<br />Al
<br />Al
<br />AS
<br />AS
<br />V3
<br />V3
<br />V3
<br />dl
<br />I V3
<br />V3
<br />AO
<br />Al
<br />AO
<br />AD
<br />AS
<br />AO
<br />- 1V9
<br />Nl
<br />V3
<br />Al
<br />V3
<br />V3
<br />Ai
<br />Al
<br />dl
<br />Al
<br />Al
<br />Al
<br />V3
<br />V3
<br />Al
<br />Al
<br />V3
<br />017
<br />LEI
<br />600
<br />WE
<br />649
<br />17
<br />20205
<br />E
<br />96E4
<br />00600
<br />46
<br />0649
<br />6110
<br />909E
<br />L 51
<br />9460
<br />EteZt
<br />t
<br />091
<br />6901
<br />9941
<br />0
<br />900
<br />966
<br />al
<br />SOS
<br />LEZ
<br />N
<br />MOBILIZATION
<br />RAILROAD PROTECTIVE SERVICES
<br />FIELD OFFICE TYPE D
<br />CLEARING
<br />CLEARING
<br />GRUBBING
<br />GRUBBING
<br />REMOVE PIPE CULVERTS
<br />REMOVE SEWER PIPE (STORM)
<br />REMOVE CURB AND GUTTER
<br />REMOVE FENCE
<br />REMOVE CONCRETE WALK
<br />REMOVE BITUMINOUS PAVEMENT
<br />REMOVE CONCRETE NOSE
<br />REMOVE DRAINAGE STRUCTURE
<br />SAWING BIT PAVEMENT (FULL DEPTH)
<br />SALVAGE CASTING
<br />SALVAGE SIGN PANEL TYPE C
<br />SALVAGE MAILBOX
<br />ABANDON PIPE SEWER
<br />COMMON EXCAVATION
<br />GRANULAR BORROW (LV)
<br />COMMON BORROW (LV)
<br />AGGREGATE BASE (CV) CLASS 5
<br />MILL BITUMINOUS SURFACE (1.51
<br />TYPE SP 12.5 WEARING COURSE MIX (3,C)
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />18" RC PIPE CULVERT
<br />15" RC PIPE APRON
<br />18" RC PIPE APRON
<br />27" RC PIPE APRON
<br />15" RC PIPE SEWER DES 3006
<br />18" RC PIPE SEWER DES 3006
<br />21" RC PIPE SEWER DES 3006
<br />24" RC PIPE SEWER DES 3006
<br />2T RC PIPE SEWER DES 3006
<br />28 SPAN RC PIPE -ARCH SEWER
<br />CONNECT TO EXISTING STORM SEWER
<br />CONNECT TO EXISTING DRAINAGE STRUCTURE
<br />24" STEEL CASING PIPE
<br />24" STEEL CASING PIPE (JACKED)
<br />INSTALL HYDRANT
<br />I OS 1
<br />1 00 E
<br />0
<br />1 O 0
<br />1 09 0L
<br />06
<br />08
<br />I 011
<br />001
<br />0£t
<br />005
<br />1 OSl I
<br />Ott
<br />I OLl I
<br />095
<br />I 061
<br />091
<br />010 I 00Z
<br />5E0
<br />0£0 1
<br />09e I 0172
<br />010
<br />090
<br />060
<br />09Z
<br />OLE
<br />00E
<br />OEE
<br />0ZE
<br />096
<br />O6E
<br />OLE
<br />096
<br />06E
<br />09E
<br />Ott
<br />004
<br />004
<br />-137-
<br />9/12/2006, Page 1
<br />
|