My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 09/26/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:51:10 PM
Creation date
9/22/2006 2:16:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />15153 Nowthen Blvd NW . <br />Ramsey, MN <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction \Contracts \1161 - Elect Res <br />TO. CONTRACTOR: <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br />Electric Resource Contractors <br />4024 Washington Avenue North <br />Minneapolis, MN 55412 <br />The Contract is changed as follows: <br />FCA 117 - Per RFI 247 change 2 D2 fixtures to 014 between grids 10.5 Add <br />and 11 . in the opening seating area. <br />FCA 68 - Furnish and install PVC collars for in concrete fixtures. <br />FCA 69 - Provide power to 115V electric locks in frames at detention <br />openings F180A, F180B, F190A. <br />FCA 73 - Add empty tray box and conduit in F160. Add single gang <br />boxes and raceways in S222. <br />FCA 75 - Revised layout of cable tray and power requirements. <br />PR 56 - Increase height of coiling counter doors F151B, F151C, F151D, <br />and F151 E. Also provide separate switching for each of these doors. <br />RFI 240 - Relocate motion detector to outside F235 and change one <br />fixture on night lighting. <br />TOTAL CHANGES: <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />BKV Group, In <br />Minneap.• is �� N <br />Electric Resource Contractors <br />Minneapolis, MN <br />CHANGE ORDER NUMBER: 1161 -06 <br />DATE: 25 -Jul -2006 <br />CONTRACTOR DATE: 01-Jun -2005 <br />CONTRACTOR FOR: RM -1161: Electrical <br />Add <br />Add <br />Add <br />Add <br />Add <br />Add <br />Add <br />City of Ramsey <br />Ramsey, MN <br />ORIGINAL <br />$900.00 <br />$3,543.00 <br />$2,759.00 <br />$1,597.00 <br />$2,681.00 <br />$1,016.00 <br />$1,058.00 <br />$13,554.00 <br />$1,239,000.00 <br />$42,644.50 <br />$1,281,644.50 <br />$13,554.00 <br />$1,295,198.50 <br />30-Sep -2006 <br />-163- <br />
The URL can be used to link to this page
Your browser does not support the video tag.