My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 09/26/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:51:10 PM
Creation date
9/22/2006 2:16:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following items are enclosed for your information: <br />a) <br />b) <br />c) <br />d) <br />e) <br />g) <br />h) <br />Site location map <br />Site plan <br />Landscaping plan <br />Building elevations <br />Grading plan <br />Draft Planning Commission meeting <br />Draft development permit <br />City Staff review letter dated August <br />Notification: <br />Site Plans do not require a public hearing. <br />Observations: <br />REQUEST FOR SITE PLAN REVIEW OF GMI EXPANSION; <br />CASE OF SHARP AND ASSOCIATES, LLC <br />By: Amy Geisler, AICP, Associate Planner <br />Background: <br />Sharp and Associates have applied for site plan review for an expansion to the GMI <br />manufacturing and office facility located at 6511 Bunker Lake Blvd. <br />minutes dated September 7, 2006 <br />31, 2006, revised September 22, 2006 <br />The site plan is proposing to construct a 9,920- square -foot addition onto GMI's existing facility, <br />which is 10,000 square feet in size. The subject property is 2.3 acres and is located in the E -1 <br />Employment District. The addition is proposed to be used for storage and receiving, which are <br />permitted uses in this district. <br />The site plan is meeting all setback requirements, with the exception of the rear yard setback, <br />which is 35 feet in the E -1 District. The submitted site plan shows a setback of 20 feet. The <br />applicant has submitted a variance request which will be considered at the October Board of <br />Adjustment meeting. <br />With the expansion, lot coverage on the site will be 19,920 square feet or 19 %. The maximum lot <br />coverage permitted by City Code is 45 %. City Code requires one parking stall for every 1,000 <br />square feet of manufacturing /warehouse space and one stall for every 300 square feet of office <br />space. The site plan indicates that the expanded building will consist of 4,000 square feet of <br />office space (13 stalls required) and 15,920 square feet of warehouse space (16 stalls required), <br />for a total of 29 parking stalls. There are 15 striped parking stalls currently on the site; the site <br />
The URL can be used to link to this page
Your browser does not support the video tag.