• Consider offering a budget to the home owner to cover the cost of standard concrete, with the home <br />owner paying any cost over and above (potentially a separate contract to complete the work) <br />Preliminary Schedule Remaining <br />• Council Approves Plans and Specifications / Authorizes Ad for Bids <br />o November 28, 2023 or <br />o December 12, 2023 <br />• Staff Receives Bids <br />o February 21, 2024 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o February 27, 2024 <br />• Contractor Begins Construction <br />o Spring 2024 <br />• Contractor Substantially Completes Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o August 2, 2024 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o August 30, 2024 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the <br />case to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic <br />bidding software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and <br />all bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title <br />sheet showing the scope of the improvements, as well as a plan sheet showing the typical sections, which <br />includes information on the proposed pavement section. Plans are available upon request from the City <br />Engineer. <br />Notification: <br />Notification is not required for this case. <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff estimates up to 20 minutes will be needed to present this case and respond to questions. <br />Observations: <br />Discussion of driveway apron replacements may affect the final design and project estimated costs. <br />Alternatives: <br />Alternative #1 — Motion recommending City Council approving plans and specifications and authorizing <br />advertisement for bids for Barthel's Rum River Acres and White Pines Estates Street Reconstructions, <br />Improvement Project #24-01. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Stormwater Utility <br />Funds. <br />Staff has completed an estimate based on final plans and anticipated 2024 construction costs, with a total <br />estimated project cost of $1,505,111, which includes 23-percent indirect costs for administrative, engineering, <br />