My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 11/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:44:46 AM
Creation date
1/17/2025 7:48:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2. <br />Public Works Committee <br />Meeting Date: 11/21/2023 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Update on Halls Dover Acres Street Reconstructions, Improvement Project #24-02 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to update the Public Works Committee on the Halls Dover Acres Street <br />Reconstructions, Improvement Project #24-02. <br />Background: <br />City Improvement Project #24-02 proposes to reconstruct the streets within the Halls Dover Acres subdivision, <br />generally located east of Nowthen Boulevard between 157th Lane and 158th Lane. The 2023 — 2032 Capital <br />Improvement Program (CIP) identifies the streets within this subdivision for street reconstruction in 2024. A <br />street segment summary is attached to this case. <br />Existing Conditions <br />The streets are 24 feet wide rural section with drainage swales adjacent to the roadway, totaling 0.98 miles in <br />length. Traffic counts have not been taken, but Staff anticipates higher than typical neighborhood traffic along <br />157th Lane due to the daycare center located at the intersection of 157th Lane and Nowthen Boulevard, but not <br />rising to the level of a collector street. <br />Sewer and water exist in the subdivision to the east, but the Halls Dover Acres subdivision is not located within <br />the MUSA. The 2040 Comprehensive Plan proposed water system improvements does include extending 12- <br />inch trunk watermain along157th Lane from Potassium Street to Nowthen Boulevard aspart of a trunk system <br />Y <br />loop. This trunk watermain extension is proposed to occur as part of this project. <br />Project History <br />• 2023 — 2032 Capital Improvement Program — listed as street reconstruction for 2024. <br />• June 13, 2023, Resolution #23-130 the Ramsey City Council accepted proposals for topographic survey <br />of the project area. <br />• June 27, 2023, Resolution #23-129 the Ramsey City Council accepted proposals for geotechnical report <br />of the project area. <br />• August 22, 2023, Resolution #23-198 the Ramsey City Council ordered Staff to prepare plans and <br />specifications. <br />Pavement History <br />The streets within Halls Dover Acres were built in 1976. The street received an overlay improvement in 1990, <br />followed by crack seal / seal coat improvements in 1996 and 2004. Maintenance crews have performed <br />patching over the last several years, including extensive patching in 2023. <br />Proposed Improvements <br />Staff review of the geotechnical report found generally sandy subsoils, ideal for both roadway embankment and <br />utility support, throughout the project area. Because of this, subsoil corrections are not anticipated, and the full - <br />depth reclamation (FDR) design process will be used. The existing alignment and profile of the streets are <br />proposed to generally be put back to existing. However, Staff found the roadway curves and centerlines tend to <br />
The URL can be used to link to this page
Your browser does not support the video tag.