My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/21/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 01/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 1:21:36 PM
Creation date
1/17/2025 10:42:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 7, 2024 <br />ITT Project 24-327 <br />Various Gravel Roads <br />IP 25-07 <br />Ramsey, Minnesota <br />geotextile fabric and select granular material meeting MnDOT specification 3149. The top of the <br />subgrade should be compacted to a minimum of 100% of standard proctor maximum density. <br />The subgrade should be sloped towards the edges to provide drainage. <br />Areas C through F: <br />The silty sand (SM), poorly graded sand with silt (SP-SM) and poorly graded sand (SP) outwash <br />soils on site this site are classified as A-1-b and A-3 soils in accordance with the American <br />Association of State Highway Transportation Officials (AASHTO) classification system. A-1-b <br />and A-3 soils are rated as excellent material for use as roadway subgrade material. Without <br />benefit of a laboratory R-value determination and based on Mn/Dot guidelines, we recommend <br />an R-value of 70 be assumed for the onsite soils. <br />Based on an assumed R-value of 70, we recommend the following bituminous pavement section <br />for low volume, 9-ton, residential streets: <br />Thickness Course/Description G.E. <br />3.5" MnDOT Superpave Bituminous 7.9" <br />6.0" MnDOT 3138 Class 5 Aggregate Base 6.0" <br />9.5" TOTAL 13.9" <br />In using the above R-value for bituminous pavement design, it is essential that the subgrade be <br />constructed of uniform soils at a moisture content and density in accordance with Mn Dot <br />specification 2105 and capable of passing a test roll in accordance with Mn Dot specification <br />2111. The native, undisturbed soils may need preparation (drying and compacting) to pass a <br />proof roll. If the subgrade is not compacted, uniform and capable of passing a test roll, then we <br />recommend the subgrade be scarified and recompacted or subcut and geotextile fabric placed <br />along with select granular material meeting Mn Dot specification 3149. The top of subgrade <br />should be compacted to a minimum of 100% of standard proctor maximum density. The <br />subgrade should be sloped towards the edges to provide drainage. <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.