My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/21/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 01/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 1:21:36 PM
Creation date
1/17/2025 10:42:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />V <br />CU <br />a <br />13 <br />CU <br />a <br />E i <br />W <br />CTS <br />• <br />E <br />w <br />i <br />N <br />0 <br />Z <br />COST EXTENSION <br />UNIT COST <br />23,400.00 5-percent of estimated construction cost with 5-percent contingency. <br />82,020.56 9.1" average aggregate depth per soil borings <br />8" under pavement, 6" under driveways. <br />U <br />0 <br />4-1 <br />w <br />O N O 00 O <br />l0 00 00 00 <br />u5 <br />al 0 O O al <br />N N 00 <br />c-I m N N m <br />r-I 00 LO Ln <br />ch tn. if, -V, -V, -(A. tn. <br />45,413.33 CV to LV conv. factor = 1.3. <br />MnDOT seed mix 25-151 plus fertilizer. <br />> Use $540,000 <br />cn v� v, v , c/} <br />O O O O O O O O O O O O O O O O O O <br />O O O O O O CD O CD CD CD CD CD CD CD CD CD CD0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g <br />o N O O m 0 0 al O M 0 6, 00 O0 00 <br />M <br />N <br />th il} th th tn. ih i n t/} ih <br />0 <br />M <br />Lu H <br />Q~ 0oLc) m 0 M l�D 00 0 0 0 O O O NohcO <br />Z `� r�-1 M Can 1p m O O N O O O O O M <br />NQ r•I N 0 r-I M 0 0 0 0 0 0 r-1 <br />n N r-I L! ) cn <br />W <br />H (/) a a a 1L Q z z a a 1L } aLU <br />J w w w J U U O O w w J cn w U Va <br />DESCRIPTION <br />MNDOT No. <br />MOBILIZATION <br />SALVAGE & RE -INSTALL MAILBOX SUPPORT <br />O <br />w <br />� z <br />z <br />O w <br />z <br />L Ln J a U w a> <br />m z a rH Ol Q W iv J <br />Lu <br />V cn OU c� Q m I- U a a U n v~i <br />E <br />11 <br />TURF ESTABLISHMENT <br />-i N N N m N co N VD Ol Ol N N M N N r-I <br />0 <br />O O O 0 0 r-1 0 0 0 O O O 0 O O O O <br />r-1 4 4 4 4 ui N d I- O O 4 l0 r-1 r-I M 5 If) <br />N 0 0 0 0 0 r-I c-I 00 l0 LID0 O M M N N <br />O -1 r-I r-1 r-1 r-1 r-1 N M M M 00 00 00 00 00 00 00 <br />N N N N N N N N N N N N N N N N N N <br />Estimated Construction Cost <br />14-Percent Indirect Cost <br />Estimated Project Cost <br />Sheet 1of6 <br />O <br />Gz <br />G <br />c-I N M Lf) lD I� 00 al N M 11) LID 00 <br />r-I r-I r-I rH rH rH rH <br />
The URL can be used to link to this page
Your browser does not support the video tag.