Laserfiche WebLink
,z 5.3,.10 at Keni[�Iwarth AveIIIIIII <br /> HOMESIDE NEIGHBOURHOOD <br /> 0 <br /> 77 <br /> Gannon St E <br /> Site: New park on the east side of Kenilworth Avenue along the <br /> Pipeline Trail <br /> The site is to be the location of a new park along a one block <br /> section of the Pipeline Trail scheduled to be complete in 2017. <br /> The location at Kenilworth allows the artwork to serve as a <br /> gateway to, and symbol of, the Pipeline Trail. The trail cuts <br /> across the street grid of the neighbourhood from the corner of <br /> Ottawa Street and Main Street to Barton Street and Strathearne <br /> Avenue following the route of the 1850s era pipeline that today <br /> still connects the water treatment plant into the city. The location <br /> offers opportunities for an artwork that can address the themes of <br /> water infrastructure and the Hamilton's industrial history. <br /> Scale: Major— Minimum Budget $100,000 (shared with park <br /> project budget) <br /> Precedent: <br /> "PO <br /> JIM <br /> City of Hamilton Public Art Master Plan 2016 34 <br />