Laserfiche WebLink
A <br />To: <br />Title: <br />Company: <br />Address: <br />Field Order/ Supplemental Instruction <br />Kevin Vranicar <br />Project Manager <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />From: <br />Title: <br />AE2S No.: <br />Field Order No.: <br />Date: <br />FO-O 1 G <br />9/11/202211111 <br />Abby Bowman <br />Resident Project Representative <br />P05434-2020-002 <br />You are hereby directed to execute this Field Order/ Supplemental Instruction that interprets or provides for <br />minor revisions to the Contract Documents without changes to the Contract Price or Time. <br />Referenced Documents): <br />❑X <br />Description of Interpretation or Change: <br />Specification Section(s): <br />Drawing(s): <br />Clarification on chemical containment trough sizes and locations to better incorporate installed electrical <br />conduit and plumbing. As well as a new structural sketch showcasing the rebar and addition of waterstop. <br />Attachments: <br />❑X Attachments (Asti: <br />A 152 Containment Sizes <br />SK-2 Structural <br />Supplemental Instructions <br />1 <br />Copies: <br />Signature: <br />Abby Bowman <br />.1M <br />❑ Posted on Newforma <br />❑ Field Office, Ryan Hanson, AE2S <br />❑X AE2S File <br />❑ Other: <br />https://ae2s.sharepoint.com/sites/ramseywtp/shared documents/06.0 construction/06.1 1 field orders/field order 16 - chemical containment <br />areas/ramsey wtp_field order no.16.docx <br />Page 1 <br />