Laserfiche WebLink
A <br />To: <br />Title: <br />Company: <br />Address: <br />Field Order/ Supplemental Instruction <br />Kevin Vranicar <br />Project Manager <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />From: <br />Title: <br />AE2S No.: <br />Field Order No.: <br />Date: <br />FO-18 <br />8/14/2024 <br />Ryan Hanson <br />Resident Project Representative <br />P05434-2020-002 <br />You are hereby directed to execute this Field Order/ Supplemental Instruction that interprets or provides for <br />minor revisions to the Contract Documents without changes to the Contract Price or Time. <br />Referenced Documents): <br />El <br />Specification Section(s): <br />Drawing(s): <br />A 100 <br />Description of Interpretation or Change: <br />Modifications to the fencing as a result of the changes to the stormwater detention pond in Field Order No. 01 j <br />Attachments: <br />❑X Attachments (/isti: <br />ASI-03 (A100) <br />ASI-03 <br />Copies: <br />Signature: <br />Ryan Hanson <br />❑ Posted on Newforma <br />❑ Field Office, Ryan Hanson, AE2S <br />❑X AE2S File <br />❑ Other: <br />https://ae2s.sharepoint.com/sites/ramseywtp/shared documents/06.0 construction/06.1 1 field orders/field order 18 - asi 03 fence/field order 18.docx <br />Page 1 <br />