Laserfiche WebLink
Erickson Electric <br />Material Cost <br />Material $ 1,994.99 <br />Tax 7.625% $ 152.12 <br />Material MU 10% $ 199.50 <br />Permit $ <br />Labor Rate/hr Hours <br />PM/Estimator $185 1 $ 185.00 <br />Wireman $175 5 $ 875.00 <br />Overtime 1-1/2 $263 0 $ <br />Overtime double time $350 0 $ <br />Labor MU 10% $ 106.00 <br />Subcontractor <br />Mat. $ <br />labor $ <br />Markup@5% $ <br />Subtotal $ 3,512.61 <br />Bond $ <br />Total cost for this chanae $ 3,512.61 <br />