My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 01/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:54:23 AM
Creation date
1/31/2025 2:59:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAGNEY[ON5TRUCTION <br />COMMERCIAL 6 INDUSTRIAL [ONTRA[TOR5 <br />�- 1401 Park Road - Chanhassen, MN 55317 <br />www.ma9neyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention Date <br />Abby Bowman 12/16/2024 <br />E-mail Phone Magney Proposal No. 031 <br />Abigail.Bowman@AE2S.com (763) 463-5036 RFP - 018 - CU 3 Relocation <br />Urgent Please comment X� Please review fl For your information <br />Total pages, including cover: 7 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br />material, and equipment to complete the requested changes In RFP No. 018 - CU-3 Relocation. To Relocate <br />CU-3 to the lower roof above the chemical rooms. Including rerouting electrical and refrigerant lines, along <br />with building and flashing Cu-3 roof curb. See the costs associated with change are summarized below. <br />Labor: Core Drill For Refrigerant & Electrical Lines $ 1,067.76 <br />Credit: Labor And Material Credit To Remove Equipment Pad $ (350.00) <br />Equipment: Lull To Lift Core Drill And Equipment Onto Roof $ 606.00 <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) $ 106.78 <br />Subcontractor: Major Mechanical Relocate CU-3 (See Attached) $ 9,110.00 <br />Subcontractor: Erickson Electric Reroute Conduit & Wiring (See Attached) $ 7,628.78 <br />Subcontractor: RTL Build Roof Curb For CU-3 (See Attached) $ 983.41 <br />Subcontractor: Central Roofing Flash Roof Curb (See Attached) $ 975.00 <br />Subtotal $ 20,127.73 <br />General Contractor's Overhead $ 1,149.44 <br />Bond &Insurance premiums $ 319.16 <br />Lump Sum Total: $ 21,596.32 <br />Additional Calendar Days Required for this Change (Including material lead time): I <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.