My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 01/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:54:23 AM
Creation date
1/31/2025 2:59:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jk),, E2 <br />Request For Proposal No. 018 <br />Date of Issuance: 11/7/2024 <br />Project Manager: <br />Aaron Vollmer, P.E. <br />AE2S <br />Water Tower Place Ste 184 <br />6901 E. Fish Lake Road <br />Maple Grove, MN 55369 <br />Contractor: Magney Construction Inc. <br />Project: Ramsey Water Treatment Plant <br />Owner: City of Ramsey, Minnesota <br />Re: CU-3 Relocation <br />Please submit a cost proposal for changes to the Contract Documents for the following <br />proposed modifications. THIS IS NOT A WORK CHANGE DIRECTIVE, CHANGE <br />ORDER, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE <br />PROPOSED MODIFICATIONS. <br />Description: <br />AE2S requests pricing from Magney for the re -location of condensing unit CU-3. The <br />manufacturer -provided plate settler cover and radon vent were removed from the <br />design. Due to this the CU-3 unit needs to be increased in size to handle the additional <br />load and the new unit will create more heat. Due to these issues, the CU-3 unit needs to <br />be moved outdoors. It was determined to locate the unit on the lower roof above the <br />chemical rooms. <br />Please provide pricing for the following: <br />1. Revise CU-3 location outside on roof. See marked up mechanical roof plan on <br />Page 2 of reviewed condensing unit submittal #067A. Verify exact location prior <br />to installation. Maintain all required service clearances to unit and adjacent <br />equipment on roof. <br />2. Coordinate unit interface with equipment curb/rails and flashing with the roofing <br />contractor. Refer to architectural details. <br />3. Provide vibration isolation in accordance with Section 23 05 48. <br />4. Revise refrigerant piping route and control wiring connections between MAU-3 <br />DX coil and CU-3 through plate settler corridor. Verify line set sizes and <br />elevations with manufacturer requirements. <br />5. Delete concrete pad below CU-3 in previous location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.