My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 01/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:54:23 AM
Creation date
1/31/2025 2:59:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN TREE <br />SHOP DRAWING REVIEW FORM <br />Project: Ramsey Water Treatment Plant <br />Project Location: Ramsey, MN <br />Owner: City of Ramsey <br />Submitting Contractor: Magney Construction <br />Submittal Description: 23 81 23 - Split -System Air -Conditioners <br />❑ No Exceptions Noted <br />Exceptions Noted (resubmittal not required) <br />❑ Revise & Resubmit <br />❑ Rejected <br />❑ Contractor Stamp of Approval Required Prior to Review <br />❑ Not Required - Not Reviewed <br />engineering land surveying <br />OERTEL ARCHITECTS <br />Q NO EXCEPTION <br />o MAKE CORRECTIONS NOTED <br />o REVISE AND RESUBMIT <br />❑ REJECTED <br />o REVIEWED FOR ARCHITECTURAL <br />CONTENT ONLY <br />• <br />REVIEW IS FOR GENERAL CONFORMANCE WITH THE <br />DOCUMENTS & DESIGN INTENT. GENERAL CONTRACTOR SHALL <br />VERIFY ALL DIMENSIONS & FIELD CONDITIONS AT JOB SITE. <br />BY Dan Greuel DATE 10/21/2024 <br />Shop Drawing review does not relieve contractor from compliance with requirements of the contract documents. This <br />check is only for review of general conformance with the design concept of the project and general compliance with <br />the information given in the contract documents. Contractor is responsible for determining the accuracy and <br />completeness of all details such as, but not limited to, dimensions, quantities, substantiating instructions for installation, <br />performance of equipment or systems, providing equipment and work which meets the requirements of governing <br />codes, coordinating work with all trades, and performing work in a safe and satisfactory manner. <br />Ryan Carter <br />Reviewed By <br />REVIEWER COMMENTS: <br />10/18/2024 <br />Date: <br />1. Unit is intended for operation with indoor MAU-3 for plate settler area cooling and dehumidification. <br />2. Closely coordinate updated location of condensing unit CU-3 to low roof with all trades. See <br />marked up mechanical roof plan on Page 2 of submittal. Verify exact location prior to installation. <br />Maintain all required service clearances to unit and adjacent equipment on roof. <br />3. Coordinate unit curb/rails and flashing with roofing contractor. Refer to architectural details. <br />4. Provide 25A circuit breaker, 3# 10, 1 # 10G wire, and confirm factory disconnect is rated for outdoor <br />use (NEMA 3R). <br />5. Coordinate all electrical connections, disconnects, and wiring to equipment with the electrical <br />contractor. Refer to manufacturer's written instructions. <br />6. Verify refrigerant piping installation, connections to equipment and all components are provided in <br />accordance with manufacturer's requirements. Refer to pipe roof penetration detail. Verify with <br />manufacturer requirements for line set sizes, max lengths and elevations. <br />7. Provide vibration isolation for roof mounted equipment per specifications. <br />PROVIDE ITEMIZED COST BREAKDOWN PRICING REQUEST FOR CHANGES AND <br />ALTERATIONS NECESSARY TO COMPLETE WORK <br />Toll Free: 888-216-1916 <br />CIVIL MECHANICAL STRUCTURAL ELECTRICAL LAND SURVEYING <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.