My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 01/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:54:23 AM
Creation date
1/31/2025 2:59:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Croix Recreation Fun Playgrounds INC. <br />1826 Tower Dr W <br />Stillwater, MN 55082 USA <br />+ 16514301247 <br />hannah@stcroixrec.com <br />Estimate <br />ADDRESS <br />City of Ramsey <br />Email: <br />accountspayable Qr ci.ramsey.m <br />n.us <br />SUP Otr <br />RECREATION <br />tufit'��iy ,�iUHUS.L.Ult`� <br />ESTIMATE # 7456 <br />DATE 01/22/2025 <br />SHIP TO <br />City of Ramsey <br />Central Park Renovation <br />Ramsey, MN 55303 <br />PLEASE DETACH TOP PORTION AND RETURN WITH YOUR PAYMENT. <br />SHIP VIA SALES REP <br />Truckload MIKE BASICH <br />ACTIVITY <br />QTY <br />RATE <br />AMOUNT <br />BC! 100-195512-1 <br />Custom Burke Proposal - Prospective Playground Equipment <br />STATE CONTRACT <br />STATE CONTRACT #218090 <br />DISCOUNT <br />Additional Discount <br />Lead time <br />Lead time estimate 8-16 weeks; ship date based on inventory at time of order. <br />Freight <br />Freight quotes currently only valid for 15 days. <br />Quote based on information currently listed on estimate. Modifications to <br />delivery address, contact or offloading capability must be made prior to order. If <br />made after order is placed, surcharges may apply. <br />Optional Installation <br />Optional installation is available and is billed by installer directly. Installation <br />includes pouring footing and placing equipment on cured footing (if applicable). <br />Does not include any additional resilient surfacing that may be required. <br />*Please reference project manager/installer directly for specific scope of work, <br />and/or additional information found in email correspondence, proposals, and <br />estimates. <br />MATERIAL ITEMS AS QUOTED ARE GOOD FOR 30 DAYS. FREIGHT <br />QUOTES ARE GOOD FOR 15 DUE TO FUEL UNCERTAINTIES. <br />SALES TAX SUBJECT TO CHANGE. ADD IF NOT TAX EXEMPT OR <br />SUPPLY EXEMPTION CERTIFICATE IF NOT ON FILE. <br />PAYMENT TERMS ARE NET 30 DAYS UNLESS OTHERWISE NOTED. <br />FAILURE TO PAY IN A TIMELY MANNER WILL BE SUBJECT TO <br />INTEREST AT A RATE OF 1.5%/MONTH OR 18% ANNUALLY. <br />*LEAD TIMES AND SHIPPING DATES ARE BASED ON CURRENT <br />INVENTORY. PLEASE BE PATIENT AS OUR VENDORS NAVIGATE <br />SUPPLY CHAINS & NATIONAL SHORTAGES. <br />SUBTOTAL <br />TAX (0%) <br />SHIPPING <br />TOTAL <br />1 314,652.00 <br />1-22,025.64 <br />1-52,150.36 <br />314,652.00T <br />-22,025.64 <br />-52,150.36T <br />1 54,000.00 54,000.00T <br />294,476.00 <br />0.00 <br />6,500.00 <br />$300,976.00 <br />By signing estimate or authorizing by email or PO, purchaser is agreeing to billing terms as listed on the estimate. Order to include model number(s), <br />quantity and color(s) above including any supplemental documents provided and/or requested. Please verify all content for accuracy. **Those purchasing <br />off of the MN State Contract are bound only by the terms and conditions listed in said contract** <br />
The URL can be used to link to this page
Your browser does not support the video tag.