My WebLink
|
Help
|
About
|
Sign Out
Home
Ramsey Resident - 2025 - March/April
Ramsey
>
Public
>
Newsletters
>
2025
>
Ramsey Resident - 2025 - March/April
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:37:50 AM
Creation date
2/12/2025 9:43:00 AM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
Newsletter
Document Date
03/01/2025
Document Title
March/April
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Treatment Plant <br /> Construction Update <br /> R a <br /> In March 2023,the Ramsey City Council unanimously ' —� - <br /> approved the construction of a Water Treatment Plant <br /> (WTP) to remove iron and manganese from the <br /> municipal water supply system to comply with Minnesota <br /> Department of Health manganese concentration <br /> guidelines. Construction of the WTP began in the A companion project was recently completed to <br /> Summer of 2023 and the plant is scheduled to be improve the trunk watermain connection from six <br /> operational this Summer.The picture of the WTP municipal water supply wells to the WTP and to deliver <br /> construction site taken on November 23,2024,shows treated water from the WTP to the municipal water <br /> the progress of construction,including two reinforced supply distribution system. <br /> concrete structures with internal piping and treatment Project costs for the WTP and associated trunk <br /> process components.The Public Works facility is shown watermain improvements total approximately <br /> in the background. $41,500,000.Funds for the improvement projects are <br /> During the construction of the WTP,water is being being drawn from several sources.The City has been <br /> drawn from municipal wells with the lowest manganese planning since 2004,including moderate incremental <br /> concentrations based on demand.Maps displaying recent water rate increases to help fund the construction without <br /> and historical manganese concentration test results needing a bond.The City was also awarded$3,200,000 <br /> from samples collected at random locations within for the project from state bonding appropriation dollars <br /> the municipal water supply system across the City are during the 2023 Legislative Session.Futhermore,the <br /> available at www.cityoframsey.com/745. City was awarded a sales tax exemption for materials used <br /> to construct the WTP,which was estimated to reduce <br /> MAP TO RECYCLING DAY EVENT project costs by$900,000. <br /> BUNKER LAKE BLVD/V� <br /> Brock Agent <br /> .,a 7533 111 Drive NW,Ste 207 <br /> - , 19 <br /> z ACCESS C <br /> CLOSED °- w / <br /> 143RDAVENUE E ERE' Q <br /> m z - <br /> cn z <br /> 441q, VD N RAMSEY <br /> ACCESS CLOSEDYOUR <br /> N/GNw�y/o INSURANCE EXPERTS <br /> 10 Call for a home insurance quote today! <br /> RECYCLING MATERIALS NOT ACCEPTED 00000AMERI AN FAMILY <br /> • Garbage of any kind • Plastic containers> 1 gal. - <br /> • Yard and tree waste • Construction debris, <br /> • Window/door glass panes paint or other household HOME I AUTO I LIFE I BUSINESS I FARM&RANCH <br /> hazardous waste materials <br /> • Furniture(except American Family Mutual Insurance Company S.I,&its Operating Companies, <br /> mattresses/box springs) identified by staff. Life Insurance underwritten by American Family Life Insurance Company, <br /> 6000 American Parkway,Madison,WI 53783©2022 21178- 8/22-21519216 <br />
The URL can be used to link to this page
Your browser does not support the video tag.