My WebLink
|
Help
|
About
|
Sign Out
Home
Ramsey Resident - 2025 - March/April
Ramsey
>
Public
>
Newsletters
>
2025
>
Ramsey Resident - 2025 - March/April
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2026 11:50:48 AM
Creation date
2/12/2025 9:43:00 AM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
Newsletter
Document Date
03/01/2025
Document Title
March/April
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Treatment Plant <br />Construction Update <br />In March 2023, the Ramsey City Council unanimously <br />approved the construction of a Water Treatment Plant <br />(WTP) to remove iron and manganese from the <br />municipal water supply system to comply with Minnesota <br />Department of Health manganese concentration <br />guidelines. Construction of the WTP began in the <br />Summer of 2023 and the plant is scheduled to be <br />operational this Summer. The picture of the WTP <br />construction site taken on November 23, 2024, shows <br />the progress of construction, including two reinforced <br />concrete structures with internal piping and treatment <br />process components. The Public Works facility is shown <br />in the background. <br />During the construction of the WTP, water is being <br />drawn from municipal wells with the lowest manganese <br />concentrations based on demand. Maps displaying recent <br />and historical manganese concentration test results <br />from samples collected at random locations within <br />the municipal water supply system across the City are <br />available at wwwcityoframsey.com/745. <br />MAP TO RECYCLING DAY EVENT <br />BUNKER LAKE BLVD,y <br />ACCESS <br />CLOSED <br />>- <br />} <br />U1 <br />Lu <br />143RD AVENUE <br />ENTEl <br />HERE <br />N <br />RECYCLING MATERIALS NOT ACCEPTED <br />• Garbage of any kind <br />• Yard and tree waste <br />• Window/door glass panes <br />• Furniture (except <br />mattresses/box springs) <br />• Plastic containers > 1 gal. <br />• Construction debris, <br />paint or other household <br />hazardous waste materials <br />identified by staff. <br />A companion project was recently completed to <br />improve the trunk watermain connection from six <br />municipal water supply wells to the WTP and to deliver <br />treated water from the WTP to the municipal water <br />supply distribution system. <br />Project costs for the WTP and associated trunk <br />watermain improvements total approximately <br />$41,500,000. Funds for the improvement projects are <br />being drawn from several sources. The City has been <br />planning since 2004, including moderate incremental <br />water rate increases to help fund the construction without <br />needing a bond. The City was also awarded $3,200,000 <br />for the project from state bonding appropriation dollars <br />during the 2023 Legislative Session. Futhermore, the <br />City was awarded a sales tax exemption for materials used <br />to construct the WTP, which was estimated to reduce <br />project costs by $900,000. <br />Brock DeVries, Agent <br />7533 Sunwood Drive NW, Ste 207 <br />(763) 421-1697 <br />bdevries@amfam.com <br />/J <br />YOUR RAMSEY <br />INSURANCE EXPERTS <br />Call for a home insurance quote today! <br />AMERISAN FAMILY <br />HOME I AUTO I LIFE I BUSINESS I FARM & RANCH <br />American Family Mutual Insurance Company S.I, & its Operating Companies, <br />Life Insurance underwritten by American Family Life Insurance Company, <br />6000 American Parkway, Madison, WI 53783 ©2022 21178 - 8/22 - 21519216 <br />Ramsey Resident I March/April 2025 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.