5.1. <br />Public Works Committee <br />Meeting Date: 02/18/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommending City Council Approving Plans and Specifications and Authorizing Advertisement for <br />Bids for High Point Street Reconstructions, Improvement Project #25-05 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approving plans and specifications and <br />authorizing advertisement for bids for High Point Street Reconstructions, Improvement Project #25-05. <br />Background: <br />The proposed 2025 — 2034 Capital Improvement Plan (CIP) identifies the streets within the High Point and <br />Section 22 Unplatted subdivision for street reconstruction in 2025. A street segment summary for the project is <br />attached to this case. <br />Existing Conditions <br />The street within Section 22 Unplatted (156th Avenue) is 26-foot urban with bituminous curbing and rural with <br />drainage swales at the low point. The streets within High Point are 31-foot urban section with bituminous <br />curbing and cross street valley gutters with drainage flumes at low points. Combined, the street total <br />approximately 1.67 miles in length. Traffic counts have not been taken within the project area, though there are <br />no destinations within the subdivision which would increase traffic above normal. <br />Municipal sewer and water do not exist in the project area, extension of municipal utilities to this subdivision <br />are not proposed as it is outside of the 2040 MUSA. Stormwater is handled with drainage flumes, which carry <br />water to existing ponds, wetlands, and Ditch 66. <br />Project History <br />• May 28, 2024, the Ramsey City Council adopted Resolution #24-138, accepting and awarding a proposal <br />to Hakanson Anderson for topographic survey of the project area. <br />• August 12, 2024, the Ramsey City Council adopted Resolution #24-220, accepting and awarding a <br />proposal to Independent Testing Technologies, Inc. for a geotechnical report of the project area. <br />• November 19, 2024, the Ramsey Public Works Committee recommended City Council order plans and <br />specifications for said improvements. <br />• November 26, 2024, the Ramsey City Council adopted Resolution #24-340, ordering the City Engineer <br />to prepare plans and specifications for said improvements. <br />• January 21, 2025, the Ramsey Public Works Committee recommended the Zirconium Street cul-de-sac <br />be constructed to a standard 100-foot diameter. <br />• February 13, 2025, Ramsey Staff held a public open house for said improvements. <br />Pavement History <br />The streets within High Point were constructed in 1979 and the street within Section 22 Unplatted was <br />constructed in 1989. All street segments received an overlay in 2001, and subsequently two crack seal / seal <br />coat treatments in 2007 and 2014. Significant patching has occurred over the last several years. <br />GPR was performed on the streets in 2024, at the time the streets averaged 2.5 to 4.3 inches of bituminous over <br />