6. 10. <br /> CC Regular Session <br /> Meeting Date: 02/25/2025 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#25-042 Approving Plans and Specifications and Authorizing Advertisement for Bids for High <br /> Point Street Reconstructions, Improvement Project#25-05 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#25-042 approving plans and specifications and authorizing <br /> advertisement for bids for High Point Street Reconstructions, Improvement Project#25-05. <br /> Background: <br /> The proposed 2025—2034 Capital Improvement Plan(CIP) identifies the streets within the High Point and <br /> Section 22 Unplatted subdivision for street reconstruction in 2025. A street segment summary for the project is <br /> attached to this case. <br /> Existing Conditions <br /> The street within Section 22 Unplatted(15 6th Avenue) is 26-foot urban with bituminous curbing and rural with <br /> drainage swales at the low points. The streets within High Point are 31-foot urban section with bituminous <br /> curbing and cross street valley gutters with drainage flumes at low points. Combined,the streets total <br /> approximately 1.67 miles in length. Traffic counts have not been taken within the project area, though there are <br /> no destinations within the subdivision which would increase traffic above normal. <br /> Municipal sewer and water do not exist in the project area, extension of municipal utilities to this subdivision are <br /> not proposed as it is outside of the 2040 MUSA. Stormwater drainage is handled with curb and gutter,valley <br /> gutters, and drainage flumes, which carry water to existing ponds, wetlands, and Ditch 66. <br /> Project History <br /> •May 28, 2024,the Ramsey City Council adopted Resolution#24-13 8, accepting and awarding a proposal <br /> to Hakanson Anderson for topographic survey of the project area. <br /> •August 12,2024,the Ramsey City Council adopted Resolution#24-220, accepting and awarding a <br /> proposal to Independent Testing Technologies, Inc. for a geotechnical report of the project area. <br /> •November 19,2024, the Ramsey Public Works Committee recommended City Council order plans and <br /> specifications for said improvements. <br /> •November 26,2024, the Ramsey City Council adopted Resolution#24-340, ordering the City Engineer to <br /> prepare plans and specifications for said improvements. <br /> •January 21, 2025,the Ramsey Public Works Committee recommended the Zirconium Street cul-de-sac be <br /> constructed to a standard 100-foot diameter. <br /> •February 13, 2025, Ramsey Staff held a public open house for said improvements. <br /> •February 18, 2025, the Ramsey Public Works Committee recommended City Council approve plans and <br /> authorize advertisement for bids for said improvements. <br /> Pavement History <br /> The streets within High Point were constructed in 1979 and the street within Section 22 Unplatted was <br /> constructed in 1989. All street segments received an overlay in 2001, and subsequently two crack seal/seal coat <br /> treatments in 2007 and 2014. Significant patching has occurred over the last several years. <br />