My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/25/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 02/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:56:06 AM
Creation date
2/24/2025 2:47:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/25/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 11. <br /> CC Regular Session <br /> Meeting Date: 02/25/2025 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#25-043 Approving Plans and Specifications and Authorizing Advertisement for Bids for <br /> Sorteberg's Street Reconstructions, Improvement Project#25-06 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#25-043 approving plans and specifications and authorize <br /> advertisement for bids for Sorteberg's Street Reconstructions, Improvement Project#25-06. <br /> Background: <br /> The proposed 2025—2034 Capital Improvement Plan(CIP) identifies the streets within the Sorteberg's <br /> subdivision for street reconstruction in 2025. A street segment summary for the project is attached to this case. <br /> Existing Conditions <br /> The streets within Sorteberg's are 31-foot urban section with bituminous curbing and drainage flumes at low <br /> points. The streets total approximately 0.54 miles in length. Traffic counts have not been taken within the project <br /> area, though there are no destinations which would increase traffic above normal. <br /> Municipal sewer and water do not exist in the project area, extension of municipal utilities to this subdivision are <br /> not proposed as it is outside of the 2040 MUSA. Stormwater is handled with drainage flumes,which carry water <br /> to existing rear-yard ponds located at 16021 Xenolith Street and 7833 159th Lane. The pond in the rear yard of <br /> 7833 159th Lane is shared with 7826 161 st Lane. This pond was excavated deeper to convert 161st Avenue from <br /> overland drainage to storm sewer inlets and piping in 2023,with the intent to also handle storm piping from 159th <br /> Lane. <br /> Project History <br /> •May 28, 2024,the Ramsey City Council adopted Resolution#24-13 8, accepting and awarding a proposal <br /> to Hakanson Anderson for topographic survey of the project area. <br /> •August 12,2024,the Ramsey City Council adopted Resolution#24-220, accepting and awarding a <br /> proposal to Independent Testing Technologies, Inc. for a geotechnical report of the project area. <br /> •November 19,2024, the Ramsey Public Works Committee recommended City Council order plans and <br /> specifications for said improvements. <br /> •November 26,2024, the Ramsey City Council adopted Resolution#24-341, ordering plans and <br /> specifications for Sorteberg's Street Reconstructions, Improvement Project#25-06. <br /> •February 13, 2025, Ramsey staff held a public open house for said improvements. <br /> •February 18, 2025, the Ramsey Public Works Committee recommended City Council approve plans and <br /> authorize advertisement for bids for said improvements. <br /> Pavement History <br /> The streets within Sorteberg's were constructed in 1979 and received an overlay in 1994. Since the overlay a <br /> crack seal/seal coat treatment occurred in 2001, and several patches have occurred over recent years. <br /> GPR was performed in 2020 at the time the streets averaged 3.3 to 3.7 inches of bituminous over 4.1 to 6.6 inches <br /> of aggregate base. <br />
The URL can be used to link to this page
Your browser does not support the video tag.