My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/24/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 01/24/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:32:51 PM
Creation date
2/28/2025 1:49:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/24/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 3 <br />The proposed project is a 124,146 -square foot (2.85-acre) parcel to be improved with a limited -service, <br />extended -stay lodging facility; the hotel will be associated with a nationally affiliated hotel brand such as <br />Home2 Suites by Hilton. The proposed subject property, which is expected to open on July 1, 2024, will <br />feature 98 rooms. The hotel will also contain the appropriate parking capacity and all necessary back -of - <br />the -house space. The proposed project would offer a pool, free breakfast, laundry facilities, and a fitness <br />center. <br />The owners recently invested in a revision of the plan after hearing from the City of Ramsey of the desire <br />for a "main street" feel along Sunwood Drive. In the family's desire to build community with Ramsey and <br />help develop the next economic opportunities, the owners committed to redesigning their prototype to <br />offer a dual entrance on the North and South of the building, add additional design and windows to the <br />North entrance, and to incorporate more gathering options along the main street for the appeal of the <br />COR's long-term vision of the area. <br />This change created a loss in revenue of 1 room shifting the keys from 99 to 98 and increased the <br />construction and design cost. <br />The family was also advised after meeting with Hilton to relocate to an alternative parcel in order to <br />accommodate and develop a larger hotel to better meet the needs of the growing community and align <br />with Hilton's preferred key count. This change required the family to evaluate a different parcel due to <br />the issue with expansion and parking with the original lot. The family worked with the city to determine <br />an alternative location best suited for the change and aligning with the COR district. Due to the decrease <br />in construction -ready land, this new parcel will required substantial earth work and underground work to <br />accommodate the build. <br />Part 4 <br />Based on the City's request and recommendation to offer a dual entrance to promote the community and <br />guest pedestrian experience and to provide access for future city development and surrounding <br />amenities, we instructed our design team to make multiple changes. We had to increase the lobby square <br />footage by approximately 50%, and we added significantly more glass than the brand requires to give the <br />Sunwood facade a primary entrance. This change created a loss in revenue of 1 room shifting the keys <br />from 99 to 98 and increased the construction and design cost. <br />Additionally, the market study is supportive of a higher percentage of queen/queen rooms which also <br />added additional square footage and cost which we believe will better serve the needs of our community, <br />while simultaneously increasing the potential tax revenue to the city. <br />Conservatively, we increased our cost for the redesign to be approximately $500,000-$600,000. <br />Along with the redesign costs, we have analyzed the shift to the alternative parcel in order to <br />accommodate a larger hotel and we are projected to incur substantially more costs associated with the <br />ground work and earth work in order to move the development forward. <br />Based on these additional unanticipated and additional costs, we are requesting additional support from <br />the City for the land cost as we as site improvements in order to better meet the needs of our community. <br />Our initial bid for the site improvement work is estimated at of $839,500. After discussions with the city, <br />we determined to request an amount of $550,000 of this cost to support the site improvement for the <br />project to commence. <br />Our current rate of return calculation and proforma show the risk and slow ramp up of this project due <br />to the slow market penetration and substantial increase in operations costs and projected inflation. Our <br />forecasts, independently analyzed, show a below average ADR and occupancy rates in comparison to the <br />industry and specifically lower than the brand average. <br />
The URL can be used to link to this page
Your browser does not support the video tag.