My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/24/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 01/24/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:32:51 PM
Creation date
2/28/2025 1:49:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/24/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No man-made materials were observed. <br />The DNR provided information on their records for the normal water level of the wetland. This information was <br />used to guide the design of the outlet. <br />Observations/Alternatives: <br />Staff met with Wes Saunders -Pearce, DNR North Metro Area Hydrologist, on October 25 and discussed the <br />plans. He liked the plans and that the City is moving towards providing a permanent outlet structure for Wetland <br />114P. He asked for some additional information to be provided with the plans. The DNR normal water level for <br />the wetland was recorded using the NGVD29 datum. The current elevation datum is NAVD88. Staff contacted a <br />surveyor that has done work for the City and asked what the correction factor is to convert from NGVD29 to <br />NAVD88. The NAVD88 is 0.34 ft higher than NGVD 29. The DNR provided a normal water level of 858.1. <br />Staff is proposing using this elevation based on NAVD88 which will result in the water level of the wetland being <br />0.34 ft higher than when the DNR recorded the elevation. <br />The DNR also asked for the hydrology model for the wetland and drainage basin. The 2-year elevation is 856.8 <br />ft, 0.5 ft above the normal elevation. The 10-year elevation is 859.8 ft, 0.8 ft above normal elevation. The <br />100-year elevation is 859.6 ft, 1.5 ft above normal elevation. The rims of the existing sanitary manholes in the <br />project area will be set at 860.6 ft, 1 foot above the 100-year elevation. <br />We also discussed timing for the DNR permit that is required to modify the outlet elevation. The DNR Permit can <br />take up to 60 days from submittal of the application to receipt of the permit. Raising the sanitary sewer manholes <br />is planned for late January/early February to take advantage of frozen conditions to allow access to the structures. <br />Mr. Saunders -Pearce recommended submitting the application soon to allow time for processing. He indicated <br />the application can be updated during the review process. <br />Funding Source: <br />The funding source will be the Stormwater Utility Fund. The Engineers Estimate for this project is $75,000. <br />Recommendation: <br />Staff recommends authorization to solicit quotes for Wetland 114P Outlet Control Improvements, <br />Improvement Project #19-07. The received quotes will be brought to the February 14, 2023 City Council <br />meeting to accept the quotes and award a contract for construction. <br />The Public Works Committee unanimously voted to recommend City Council authorization to advertise bids for <br />this project on November 15, 2022. <br />Action: <br />Motion to authorize solicitation of quotes for Wetland 114P Outlet Control Improvements, Improvement <br />Project #19-07. The received quotes will be brought to the February 14, 2023 City Council meeting to accept the <br />quotes and award a contract for construction. <br />Resolution 23-038 <br />Plans <br />RFQ <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Kathy Schmitz 01/19/2023 03:37 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.