My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/08/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 05/08/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:21:46 PM
Creation date
10/10/2006 10:42:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/08/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />r FC CASE # <br />CONSIDER AUTHORIZATION OF HIGHWAY #10 REDEVELOPMENT PLANNING <br />r SERVICES SECOND ADDENDUM <br />By: James E. Norman, City Administrator <br />r Background: <br />r % The City contracted for planning services with Hoisington Koegler Group Incorporated (HKGi) <br />on May 20, 1999, to perform a planning study for redevelopment along the Highway #10 <br />corridor. The report was presented and accepted in November 2000. As part of the study, an <br />r area north of Highway #10, between Sunfish Lake Boulevard and Ramsey Boulevard was used <br />as a focus area for the study of a proposed. frontage road system. The Council, in separate action, <br />on February 27, 2001, authorized addendum to the study area to include two additional segments <br />north of Highway #10 from Sunfish Lake Boulevard to the Anoka/Ramsey corporate limits and <br />the north side of Highway #10 from Ramsey Boulevard to Armstrong Boulevard. <br />As the consultant began to work on the project, it became apparent that it was necessary to <br />include segments south of Highway #10. The current study will show a frontage road system <br />between Sunfish Lake Boulevard and Thurston Avenue in Anoka, which will dissect the Anoka- <br />Hennepin Technical College property. An access point to Highway #10 should line up with an <br />access point on the south part of Highway #10 in Ramsey. Additionally, City staff has recently <br />had discussions with business interests in the area south of Highway #10 and east of Sunfish <br />Lake Boulevard. <br />Recommendation: <br />Staff requests authorization to perform an addendum to the Highway #10 Frontage Road Study <br />authorizing HKGi to perform the study at a not -to- exceed cost of $5,000. Funding for the <br />r services would come from the EDA fund. <br />Council Action: <br />r <br />Motion to authorize HKGi to perform a Highway #10 Redevelopment Planning Study Second <br />Addendum to include areas south of Highway #10. <br />r <br />Reviewed by: <br />' City Administrator <br />Finance Officer <br />r Community Development Director <br />FC: 05/08/01 <br />t -145- <br />
The URL can be used to link to this page
Your browser does not support the video tag.