My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 03/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:35:43 PM
Creation date
3/6/2025 3:46:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
upon the Subject Property for the purpose of replacing plantings in the event of the <br />PERMITTEE's default. <br />17. Street Cleaning and Clean Up. After the street surfacing that is a part of the Stage I <br />Improvements is installed, the PERMITTEE shall clear any soil, earth, or debris from the <br />streets. From time to time, the CITY may remove accumulations of soil, earth, and debris <br />from the streets resulting from the construction of the Stage I Improvements. It shall be <br />the PERMITTEE'S responsibility to pay the costs associated with this necessary street <br />cleaning. Invoices from the CITY to the PERMITTEE for such costs shall be paid within <br />fifteen (15) days of the date of the invoice. <br />18. Payment of Development Fees. The PERMITTEE must pay to the CITY the fees <br />described on Exhibit B which may include, but are not limited to, Park Land Dedication <br />Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) Fees, Water <br />Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, Water Lateral Fees, Storm <br />Management Fees, Street Signage Fees, and Street Light Operation and Maintenance Fees. <br />19. Requirements for Building and Occupancy Permits. <br />a. No building permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) installed a Class 5 driving surface to within 300 feet of the structure; (b) <br />provided the CITY Building Official with a Certificate of Survey; c.) the financial <br />guaranty described in Section 12 to the CITY; d.) obtained all necessary permits <br />from the Lower Rum River Watershed Management Organization and has <br />provided a copy of such permit to the CITY; and <br />b. No occupancy permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) constructed vehicular access to the lot, including the installation of at least <br />one layer of bituminous surfacing; (b) constructed all utilities and storm water <br />facilities this Agreement requires to serve the lot and such utilities and storm water <br />facilities are in place, operational and accepted by the CITY; (c) for lots that have <br />a slope of less than 2%, provided the CITY with a certificate of grading, prepared <br />by a licensed (State of Minnesota) professional land surveyor, certifying that the <br />flattest grade on the lot is 1 % or greater; and (d) installed and planted the sod and <br />landscaping that are required as a part of the Stage I Improvements, weather <br />permitting. <br />i. No Parking loading, unloading or staging of any vehicles, equipment or materials <br />is allowed on Bunker Lake Boulevard, Zeolite Street, or Ramsey Parkway. <br />ii. If there are any conflicts between the activities of the homebuilder and the <br />street/utility contractor, the street/utility contractor shall be given priority. <br />iii. The CITY's building inspectors shall have access to each home for normal <br />scheduled inspections. If access is not provided, PERTIMEE shall forfeit the <br />inspection and pay the normal reinspection fee. <br />20. PERMITTEE Defaults. If the PERMITTEE defaults in the performance of one or more <br />of the PERMITTEE'S obligations under this Agreement, i) the CITY gives the <br />PERMITTEE thirty (30) days written notice of the default and ii) the PERMITTEE fails <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.