My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 03/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:35:43 PM
Creation date
3/6/2025 3:46:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement. To be binding, amendments or waivers shall be in writing, signed by <br />the parties, and approved by a resolution of the CITY Council. The CITY' S or <br />the PERMITTEE' S failure to promptly take legal action to enforce this <br />Agreement shall not be a waiver or release. <br />C. Compliance with Laws and Regulations. The PERMITTEE represents to the <br />CITY that the Plat complies with all CITY, County, metropolitan, State, and <br />Federal laws and regulations, including but not limited to: subdivision ordinances, <br />zoning ordinances and environmental regulations. If the CITY determines that the <br />Plat does not comply, the CITY may, at its option, refuse to allow any construction <br />or development work in the Plat until the PERMITTEE does comply. Upon the <br />CITY' S demand PERMITTEE shall cease work until there is compliance. <br />d. Mailbox Locations. If the PERMITTEE desires to construct mailboxes within <br />the public right of way, the PERMITTEE agrees that the placement of mailboxes <br />along public streets is subject to approval by the United States Postal Service and <br />Anoka County Highway Department standards. Utility locates will be necessary. <br />e. Boulevard and Wetland Restoration. The PERMITTEE shall be responsible for <br />the cost of establishing seed in all boulevards within thirty (30) days of the <br />completion of the driveway and street improvements, and restoring all other areas <br />disturbed by the development grading operation in accordance with the approved <br />Grading, Drainage and Erosion Control plan. The PERMITTEE shall be <br />responsible for the cost of cleaning any soil, earth, or debris from the wetlands <br />within and adjacent to this Plat resulting from grading performed in the <br />development of the Plat. <br />£ Construction, Hours and Entrance Signs. The CITY restricts construction and <br />delivery hours to Monday through Saturday 7:00 a.m. to 10:00 p.m. The <br />PERMITTEE is required to provide a sign at each entrance point stating delivery <br />and construction operation hours. Said signs are not to exceed eighty (80) square <br />feet in size and must be clearly visible at all times during the construction period. <br />g. Construction Site Maintenance. The PERMITTEE shall adhere to all of the <br />CITY ordinances relating to, but not limited to, dumping of garbage, site <br />development, construction debris, open burning, etc. The CITY reserves the right <br />to withhold permits, inspections, or certificates of occupancy to correct violations <br />relating to construction site maintenance. <br />h. Estimated Cost. It is understood and agreed that cost amounts set forth in this <br />Agreement as to Stage I, Stage II, and Required Private Improvements, unless <br />qualified as fixed amounts, are estimated. The PERMITTEE agrees to pay the <br />entire cost of said improvements including interest, engineering and legal fees <br />related thereto. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.