My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 03/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:35:43 PM
Creation date
3/6/2025 3:46:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • • t - t • t 111-11 IN - ME <br />• t • t t • • • <br />11MR- <br />(8) Construction methods. Due precautions shall be taken during the construction of a swimming <br />pool or spa to avoid damage, hazards, or inconvenience to adjacent or nearby property, and to <br />ensure that proper care is taken in stock piling excavated material in order to avoid erosion, dust, <br />or other infringement onto adjacent property. <br />Sec. 106-202. Required sureties and financial guarantees. <br />Upon approval of a land use application or administrative site plan review where a new building and/or site <br />improvements are being constructed or reconstructed, the city shall be provided with a cash escrow, cash <br />bond, and/or letters of credit prior to the issuing of building permits or initiation of work on the proposed <br />improvements or development. This security shall guarantee conformance and compliance with the <br />conditions of the approval and the provisions of this Code. <br />(1) The security shall be in the amount equal to 75 percent (improvements on private property) and <br />125 percent (improvements in public right-of-way) the applicant's estimated costs of labor and <br />materials for the proposed improvements or development. <br />(2) The city shall hold the security until completion of the proposed improvements or development and <br />a certificate of occupancy indicating compliance with the provisions of the land use application and <br />this chapter has been issued by the building official. A maintenance period of two years for <br />landscaping improvements may be collected as established by the annual fee schedule. Periodic <br />reductions may be requested b, the applicant no more frequently than once per month, provided <br />the initial reduced amount is at least 40 percent of the original estimated costs and subsequent <br />reductions of at least 10 percent the original estimated costs. <br />(3) Failure to comply with the conditions of the land use application approvals and the provisions of <br />this chapter shall result in forfeiture of the security. <br />(4) Landscape escrow for single-family lots. A landscape escrow, in an amount to be determined by <br />the annual fee schedule, shall be deposited for all required landscaping, including topsoil, sod, and <br />trees, which is not established at the time of issuance of a certificate of occupancy. Installation of <br />required landscaping, including topsoil, established groundcover, and trees, shall be completed <br />within six months of the issuance of the certificate of occupancy, weather permitting. The city may <br />draw upon the escrow to install the required landscaping if said work is not completed within six <br />months of the date of issuance of the certificate of occupancy. <br />(5) Driveway escrow for single-family or townhome lots. A driveway escrow, in an amount to be <br />determined by the annual fee schedule, shall be deposited for all required driveways not installed <br />at the time of issuance of a certificate of occupancy. Installation of required driveways shall be <br />completed within six months of the issuance of the certificate of occupancy, weather permitting. <br />The city may draw upon the escrow to install the required driveway if said work is not completed <br />within six months of the date of issuance of the certificate of occupancy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.