My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 03/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:35:43 PM
Creation date
3/6/2025 3:46:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed improvements are designated as City Improvement Project #25-09, 2025 Crack Seal Improvements. <br />Notification: <br />Advertisements were published in the Anoka Union Herald on January 28 and February 7, 2025. Bids were also <br />advertised on-line on Quest CDN. <br />Letters are not mailed to property owners for crack seal improvements due to the relatively minor impacts to <br />property owners and the traveling public during these projects. Engineering Staff maintains a project webpage <br />which will be updated with the most current project information. <br />Time Frame/Observations/Alternatives: <br />Time Frame: <br />Staff estimates up to 10 minutes will be required to present the case and answer questions. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #25-054 accepting bids and awarding contract for 2025 Crack Seal <br />Improvements, Improvement Project #25-09. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />On March 3, 2025 a total of five (5) bids were received, opened, and tabulated, and the following bids were found <br />to comply with the advertisement for bids. <br />Contractor <br />FlowSeal Surface Maintenance <br />orthwest Asphalt & Maintenance <br />Allied Blacktop Company <br />Asphalt Surface Technologies Corp. <br />Fahrner Asphalt Sealers, L.L.C. <br />ngineer's Estimate <br />Total Bid <br />$1541749.49 <br />$2571626.09 <br />$3251061.78 <br />$3331702.25 <br />$4081040.31 <br />$221, 714.20 <br />The bid of FlowSeal Surface Maintenance of Elk River, Minnesota, in the amount of $154,749.49 for the total bid <br />for construction of said improvements in accordance with the approved plans and specifications and <br />advertisement for bids, is the lowest responsible bidder. Adding indirect costs in the amount of 5-percent brings <br />the total project costs to $162,486.96. <br />Per the final plans and specifications, estimated construction costs were $221,714.20. After adding 5-percent for <br />indirect costs for administrative, engineering, finance and legal costs, estimated project costs totaled $232,799.91. <br />The low bid is 30-percent lower than the engineer's estimate. <br />City Staff proposes to administer and inspect construction. <br />Plans and specifications were prepared in-house as part of Staffs normal duties. <br />Recommendation: <br />Staff recommends adopting Resolution #25-054 accepting bids and awarding contract for 2025 Crack Seal <br />Improvements, Improvement Project #25-09. <br />Outcome/Action: <br />
The URL can be used to link to this page
Your browser does not support the video tag.