My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/17/2025
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2025
>
Agenda - Environmental Policy Board - 03/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:28:10 PM
Creation date
3/13/2025 1:24:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Year 2 is the second full growing season. 3 total visits are typical with 2 complete site <br />mowings and 1 Integrated Vegetation Maintenance visit the most likely combination. <br />Year 3 typically requires 3 IVM site visits depending on vegetation status. <br />6.3. Maintenance Phase <br />Year 4— 34. During the maintenance phase, 2 IVM visits are typical. <br />7. Monitoring <br />Consistent project monitoring is essential to evaluate vegetative establishment, weed <br />presence, and possible erosion concerns. This information helps determine which <br />management procedures to utilize, the proper timing for those procedures, and whether <br />any other remedial action is required such as reseeding or replanting. As the site's <br />vegetation matures, adaptive management should be utilized as previously described. <br />atNatural <br />Resource <br />Services <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.