My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/17/2025
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2025
>
Agenda - Environmental Policy Board - 03/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:28:10 PM
Creation date
3/13/2025 1:24:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The minimum required width of the bufferyard is forty (40) feet, with an additional thirty percent (30%) of <br />plantings in this area. The plans do satisfy the bufferyard (and general landscaping) requirements. Staff has <br />recommended utilizing a different shrub species in the bufferyard, as the Andorra juniper does not typically get <br />much taller than two (2) feet. Furthermore, it appears that the labeling for the juniper shrub has a typo, which <br />Staff has requested to be corrected (shows the size of the shrubs as 2.5" rather than 24" in height or width, <br />depending on the species' growth characteristics). Otherwise, the Landscape Plan is generally acceptable. <br />RV Dump Station <br />There is currently an RV dump station near the southeastern corner of the parking lot on the Subject Property. <br />This dump station is currently connected to the septic system. However, since the septic system is being <br />abandoned, the Applicant is proposing to connect the RV dump station to the sanitary sewer as part of this <br />project. The City's Utilities Supervisor is meeting with the Applicant to better understand how this system will <br />work and what safeguards need to be in place to protect the City's sanitary sewer system. <br />Funding Source: <br />All costs associated with this review are the Applicant's responsibility. <br />Recommendation: <br />Staff recommends approval of the natural resources aspects of this project, contingent upon compliance with <br />Staffs review comments. <br />Outcome/Action: <br />Motion to recommend approval of the natural resources aspects of the Site Plan. <br />Site Location Map <br />Certificate of Survey <br />Grading, Drainage, and Erosion Control Plan <br />Site and Dimension Plan <br />Utility Plan <br />Landscape Plan with Staff Review Comments <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 03/13/2025 12:48 PM <br />Form Started By: Chris Anderson Started On: 03/04/2025 10:36 AM <br />Final Approval Date: 03/13/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.